-
Adijo panika in tesnobaIvanović, BojanaUčinkovite metode in nasveti iz prve roke, kako razumeti, sprejeti, obvladati, umiriti ter premagati panične napade in tesnobo ter povrniti nazaj nadzor nad svojim življenjem. Knjiga bo vaša ... prijateljica v temnih trenutkih. Vaše olajšanje, ko ne boste vedeli kaj narediti. Vaša opora, ko bodo vaše moči popustile. In vaše upanje, da niste sami v tem in da je paniko ter tesnobo možno premagati. Source: dCOBISSType of material - handbook ; adult, seriousEdition - 1. natisPublication and manufacture - Ljubljana : samozal. B. Ivanovič, 2023Language - slovenianISBN - 978-961-95717-3-6COBISS.SI-ID - 156607747
Author
Ivanović, Bojana
Topics
Tesnoba |
Obvladovanje |
Psihotehnike |
Priročniki |
Duševna stiska |
Samopomoč |
Priročniki |
Panična motnja |
Tehnike samopomoči |
anksiozne motnje |
simptomi |
preprečevanje |
sproščanje |
psihoterapija |
psihološki nasveti |
osebna doživetja
Reserve material at the desired pickup location.
Pickup location |
Material status | Reservation |
---|---|---|
K. Jurij Vega Dol |
available - outside loan, loan period: 21 days
|
|
Dol - paketnik |
available - outside loan, loan period: 21 days
|
|
Fužine |
available - outside loan, loan period: 21 days
|
|
KJM Moste |
available - outside loan, loan period: 21 days
|
|
Polje |
available - outside loan, loan period: 21 days
|
|
Zalog |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Jarše |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Zadvor |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
KJM Moste - paketnik |
available - outside loan, loan period: 21 days
|
|
K. Otona Župančiča |
available - outside loan, loan period: 21 days
|
|
Po pošti (po ceniku Pošte - cca. 4 eur)
return to Jožeta Mazovca Moste (KJM) |
delivery from another location
available - outside loan, loan period: 21 days
|
|
Polje - paketnik |
available - outside loan, loan period: 21 days
|
|
K. Otona Župančiča - paketnik |
available - outside loan, loan period: 21 days
|
|
Rog (1,30 EUR) |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Šiška |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Šiška |
on loan - outside loan, due date: 31.08.2024
Expected to be available after: 28.08.2024 (1. in queue) |
|
Bežigrad |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Bežigrad |
on loan - outside loan, due date: 02.09.2024
Expected to be available after: 03.09.2024 (1. in queue) |
|
Brezovica |
available - outside loan, loan period: 21 days
|
|
Bežigrad - paketnik |
on loan - outside loan, due date: 02.09.2024
Expected to be available after: 03.09.2024 (1. in queue) |
|
Črnuče (1,30 EUR) |
to view all reservation options, click the "reserve" button
on loan - outside loan, due date: 02.09.2024
Expected to be available after: 03.09.2024 (1. in queue) |
|
K. F. Škerla (1,30 EUR) |
to view all reservation options, click the "reserve" button
on loan - outside loan, due date: 02.09.2024
Expected to be available after: 03.09.2024 (1. in queue) |
|
Glinškova p. (1,30 EUR) |
to view all reservation options, click the "reserve" button
on loan - outside loan, due date: 02.09.2024
Expected to be available after: 03.09.2024 (1. in queue) |
|
Savsko n. (1,30 EUR) |
to view all reservation options, click the "reserve" button
on loan - outside loan, due date: 02.09.2024
Expected to be available after: 03.09.2024 (1. in queue) |
|
Ig |
on loan - outside loan, due date: 26.08.2024
Expected to be available after: 27.08.2024 (1. in queue) |
|
Ig - paketnik |
on loan - outside loan, due date: 26.08.2024
Expected to be available after: 27.08.2024 (1. in queue) |
|
Rudnik |
on loan - outside loan, due date: 16.08.2024
Expected to be available after: 19.08.2024 (1. in queue) |
|
Škofljica |
on loan - outside loan, due date: 04.09.2024
Expected to be available after: 05.09.2024 (1. in queue) |
|
Grba |
to view all reservation options, click the "reserve" button
on loan - outside loan, due date: 16.08.2024
Expected to be available after: 19.08.2024 (1. in queue) |
|
Rudnik - paketnik |
on loan - outside loan, due date: 16.08.2024
Expected to be available after: 19.08.2024 (1. in queue) |
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Ivanović, Bojana |
Select pickup location:
Material pickup by post
Notification
Select pickup location
Pickup location | Material status | Reservation |
---|
Please wait a moment.