Akademska digitalna zbirka SLovenije - logo

Search results

Basic search    Expert search   

Currently you are NOT authorised to access e-resources SI consortium. For full access, REGISTER.

1
hits: 8
1.
  • Cyclic extrusion compressio... Cyclic extrusion compression angular pressing (CECAP) as a novel severe plastic deformation method for producing bulk ultrafine grained metals
    Ensafi, Mahnaz; Faraji, Ghader; Abdolvand, Hooman Materials letters, 06/2017, Volume: 197
    Journal Article
    Peer reviewed
    Open access

    •A new SPD method entitled cyclic extrusion compression angular pressing is presented.•The new process solve drawback of CEC method which needs backpressure.•Higher hydrostatic compressive stress is ...
Full text
Available for: GEOZS, IJS, IMTLJ, KILJ, KISLJ, NUK, OILJ, PNG, SAZU, SBCE, SBJE, UL, UM, UPCLJ, UPUK, ZRSKP

PDF
2.
  • Wayfinding in Interior Envi... Wayfinding in Interior Environments: An Integrative Review
    Jamshidi, Saman; Ensafi, Mahnaz; Pati, Debajyoti Frontiers in psychology, 11/2020, Volume: 11
    Journal Article
    Peer reviewed
    Open access

    Wayfinding is an issue in complex facilities—including hospitals, airports, and office buildings—and wayfinding difficulties are associated with negative psychological and physiological consequences. ...
Full text
Available for: NUK, UL, UM, UPUK

PDF
3.
  • Linking BIM to Power BI and... Linking BIM to Power BI and HoloLens 2 to Support Facility Management: A Case Study Approach
    Harode, Ashit; Ensafi, Mahnaz; Thabet, Walid Buildings, 06/2022, Volume: 12, Issue: 6
    Journal Article
    Peer reviewed
    Open access

    Facility lifecycle data captured in BIM during design and construction are very valuable for effective facility operations and maintenance. Traditionally, model authoring and analysis tools have been ...
Full text
Available for: NUK, UL, UM, UPUK
4.
  • Developing systems-centric ... Developing systems-centric as-built BIMs to support facility emergency management: A case study approach
    Ensafi, Mahnaz; Harode, Ashit; Thabet, Walid Automation in construction, January 2022, 2022-01-00, 20220101, Volume: 133
    Journal Article
    Peer reviewed
    Open access

    Current as-built Building Information Model (BIM) deliverables generated following design and construction generally do not fulfill facility management needs. To provide total value to the facility ...
Full text
Available for: GEOZS, IJS, IMTLJ, KILJ, KISLJ, NLZOH, NUK, OILJ, PNG, SAZU, SBCE, SBJE, UILJ, UL, UM, UPCLJ, UPUK, ZAGLJ, ZRSKP

PDF
5.
  • Investigation of work order... Investigation of work order processing in different facilities: a questionnaire-based survey
    Ensafi, Mahnaz; Thabet, Walid; Besiktepe, Deniz Facilities (Bradford, West Yorkshire, England), 03/2024, Volume: 42, Issue: 5/6
    Journal Article
    Peer reviewed

    Purpose The aim of this paper was to study current practices in FM work order processing to support and improve decision-making. Processing and prioritizing work orders constitute a critical part of ...
Full text
Available for: NUK, UL, UM, UPUK
6.
  • Work order prioritization u... Work order prioritization using neural networks to improve building operation
    Journal of information technology in construction, 01/2024, Volume: 29
    Journal Article
    Peer reviewed
    Open access

    Current practices for prioritizing maintenance work orders are mainly user-driven and lack consistency in collecting, processing, and managing the large amount of data. While decision-making methods ...
Full text
Available for: NUK, UL, UM, UPUK
7.
  • Challenges and gaps with us... Challenges and gaps with user-led decision-making for prioritizing maintenance work orders
    Ensafi, Mahnaz; Thabet, Walid; Afsari, Kereshmeh ... Journal of Building Engineering, 05/2023, Volume: 66
    Journal Article
    Peer reviewed

    A vast amount of work orders is submitted daily which is a critical component of management for any facility. The process taken for prioritizing work orders, however, shows a high dependency on the ...
Full text
Available for: GEOZS, IJS, IMTLJ, KILJ, KISLJ, NLZOH, NUK, OILJ, PNG, SAZU, SBCE, SBJE, UILJ, UL, UM, UPCLJ, UPUK, ZAGLJ, ZRSKP
8.
  • Work Order Prioritization Using Neural Networks to Improve Building Operation
    Ensafi, Mahnaz
    Dissertation

    Facility management involves a variety of processes with a large amount of data for managing and maintaining facilities. Processing and prioritizing work orders constitute a big part of facility ...
Check availability
1
hits: 8

Load filters