With increasing renewable energy resources, price-sensitive loads, and electric-vehicle charging stations in the power grid, uncertainties on both power generation and consumption sides become ...critical factors in the Security-Constrained Unit Commitment (SCUC) problem. Recently, worst scenario based robust optimization approaches are employed to consider uncertainties. This paper proposes a non-conservative robust SCUC model and an effective solution approach. The contributions of this paper are three-fold. First, the commitment and dispatch solution obtained in this paper can be directly used in day-ahead market as it overcomes two issues, conservativeness and absence of robust dispatch, which are the two largest obstacles to applying robust SCUC in real markets. Secondly, a new concept recourse cost requirement, similar to reserve requirement, is proposed to define the upper bound of re-dispatch cost when uncertainties are revealed. Thirdly, a novel decomposition approach is proposed to effectively address the well-known computational challenge in robust approaches. Simulation results on the IEEE 118-bus system validate the effectiveness of the proposed novel model and solution approach.
Two critical issues have arisen in transmission expansion planning with the rapid growth of wind power generation. First, severe power ramping events in daily operation due to the high variability of ...wind power generation pose great challenges to multi-year planning decision making. Second, the long construction periods of transmission lines may not be able to keep pace with the fast growing uncertainty due to the increasing integration of wind power generation. To address such issues, we propose a comprehensive robust planning model considering different resources, namely, transmission lines, generators, and FACTS devices. Various factors are taken into account, including flexibility requirements, construction period, and cost. We construct the hourly net load ramping uncertainty (HLRU) set to characterize the variation of hourly net load including wind power generation, and the annual net load duration curve uncertainty (LDCU) set for the uncertainty of normal annual net load duration curve. This results in a two-stage robust optimization model with two different types of uncertainty sets, which are decoupled into two different sets of subproblems to make the entire solution process tractable. Numerical simulations with real-world data show that the proposed model and solution method are effective in coordinating different flexible resources and rendering robust expansion planning strategies.
With increasing renewable penetration in power systems, considerable research efforts have been focused on how to accommodate the uncertainties from renewables in the Security-Constraint Unit ...Commitment (SCUC) problem. One of the candidate approaches to handling uncertainties is the two-stage Robust SCUC (RSCUC), which enables system to survive in any scenario. The survivability is guaranteed by the solution optimality of the max-min problem in the second stage. However, as the non-convex max-min problem is NP-hard, it is difficult to get the exact optimal solution in acceptable time. In this paper, we propose a new efficient formulation which recasts the max-min problem to a Mixed Integer Programming (MIP) problem using Binary Expansion (BE). The upper bound of the gap between the new MIP problem and the original max-min problem is derived. The gap, which quantifies the solution optimality of the max-min problem, is controllable. Two effective acceleration techniques are proposed to improve the performance of the MIP problem by eliminating inactive flow constraints and decomposing time-coupled uncertainty budget constraints. Accordingly, the computation burden of solving the max-min problem is reduced tremendously. The simulation results for the IEEE 118-Bus system validate and demonstrate the effectiveness of the new BE-based solution approach to the two-stage RSCUC and the acceleration techniques.
In this letter, a set of general necessary conditions for line congestions are established during ramping delivery, i.e., the redispatch process for uncertainty accommodation. Mathematically, the ...consideration of all line flow constraints may cause the intractability of the max-min problem in robust security-constrained unit commitment and dispatch. Without solving time-consuming linear programming (LP) problems, the lines that will not be congested can be quickly identified based on the necessary conditions and corresponding line flow constraints can be removed from the max-min subproblem in robust approaches. A promising application of the conditions is presented via the preprocessed max-min problem with high computational performance.
The potential economic impact of transmission line rating (TLR) attacks in two-settlement electricity markets is studied in this paper. We show that nodal prices in real-time markets can be ...manipulated via a TLR attack, which can be modeled as a bi-level optimization problem. Several acceleration techniques are developed to reduce the computational burden of solving the bi-level problem. A heuristic strategy is proposed to deal with the issue of multiplicity in pricing. The uncertainties in load are also considered in the proposed TLR model. Numerical simulations demonstrate that well-designed TLR attacks can manipulate the profits of market participants in the two-settlement markets. Benchmark testing shows that the proposed acceleration techniques can reduce computation time tremendously, and the proposed heuristic strategy can mitigate the issue of multiplicity in pricing.
Heat shock proteins belong to a conserved protein family and are involved in multiple cellular processes. Heat shock protein 27 (Hsp27), also known as heat HSPB1, participates in cellular responses ...to not only heat shock, but also oxidative or chemical stresses. However, the contribution of HSPB1 to anti-oxidative response remains unclear. Here, we show that HSPB1 activates G6PD in response to oxidative stress or DNA damage. HSPB1 enhances the binding between G6PD and SIRT2, leading to deacetylation and activation of G6PD. Besides, HSPB1 activates G6PD to sustain cellular NADPH and pentose production in glioma cells. High expression of HSPB1 correlates with poor survivalrate of glioma patients. Together, our study uncovers the molecular mechanism by which HSPB1 activates G6PD to protect cells from oxidative and DNA damage stress.
Full text
Available for:
DOBA, IZUM, KILJ, NUK, PILJ, PNG, SAZU, SIK, UILJ, UKNU, UL, UM, UPUK
This study presents an approach to co-optimization of transactive flexibility, energy, and optimal injection-range of Variable Energy Resource (VER). Flexibility receives immense attention, as it is ...the essential resource to accommodate VERs in modern power systems. With a novel concept of transactive flexibility, the proposed approach proactively positions the flexible resources and optimizes the demand of flexibility. A surrogate affine approximation (SAA) method is proposed to solve the problem with variable infinite-constraint range in polynomial time. It is shown that SAA is more optimistic than the traditional affine policy in the power literature. The SAA method is also applicable to the search for secure injection-range of VER, which is often heuristically determined in industry given the latest system information. In practice, VER generation beyond the secure injection-range has to be curtailed, even if its cost is lower than the marginal price. The proposed technique helps accommodate more VERs securely and economically by increasing secure injection-range. The model and the solution approach are illustrated in the 6-bus system and IEEE 118-bus system.
In recent years, the deployment of high-voltage direct current (HVDC) tie-lines in power grids has become a prevalent solution in some countries to transmit renewable energy from remote locations to ...load centers. However, the variability and uncertainty associated with renewable energy generation pose challenges to effectively utilizing this technology. This work proposes a novel multistage planning-operation model, aiming to unlock the potential flexibility in the HVDC transmission system and increase the renewable penetration. By incorporating flexibility, which is essential for accommodating the uncertainty in renewable generation, our model optimally shares the inter-regional flexibility between the sending- and receiving-end grids. One of the key features of our proposed model is its robustness and non-anticipativity, meaning it can account for different levels of uncertainty and make decisions that are suitable for multiple scenarios. This work develops two solution approaches to solve this challenging multistage model with variable uncertainty sets. We validate the proposed approach through a case study conducted on a real-world inter-regional grid. The numerical results demonstrate that our approach effectively unlocks more inter-regional flexibility and assists in increasing the renewable hosting capacity.
Obtaining high-quality feasible solution is the core and the major difficulty in solving security-constrained unit commitment (SCUC) problems. This paper presents a systematic method for constructing ...feasible solutions to SCUC problem based on a group of analytical feasibility conditions. The feasibility check is performed based on the analytical necessary conditions such that most of infeasible UC states can be identified without solving LP problem. If a UC state is infeasible, it is adjusted with the possibly minimal operating cost increase based on the cost information. This UC adjusting issue is formulated as a zero-one programming problem and a branch and bound (B&B) method is established based on these feasibility conditions. Numerical testing is performed for a 31-bus system, an IEEE 24-bus system, and an IEEE 118-bus system. The testing results suggest that over 95% of infeasible UC states are identified by the analytical necessary conditions. The near-optimal feasible schedules for SCUC problem can be obtained efficiently by the proposed method. The feasible schedules obtained are compared with those obtained from mixed integer programming-based method in the IEEE 118-bus system. It is shown that the new method can produce competitive results in terms of solution quality and computational efficiency.