Akademska digitalna zbirka SLovenije - logo
MKK - Public Library of Kranj - all departments (SIKKR)
  • Piki gre na pot
    Hill, Eric, 1927-2014
    Type of material - picture book ; pre-primary, ages 0-5
    Edition - 1. izd.
    Publication and manufacture - Ljubljana : Mladinska knjiga, 2023
    Language - slovenian
    ISBN - 978-961-01-6758-7
    COBISS.SI-ID - 124018947

Reserve material at the desired pickup location.

Pickup location Material status Reservation
Kranj
available - outside loan, loan period: 21 days
Knjižnica24Globus
Parcel box
to view all reservation options, click the "reserve" button
Stražišče
to view all reservation options, click the "reserve" button
Naklo
to view all reservation options, click the "reserve" button
Šenčur
to view all reservation options, click the "reserve" button
Cerklje
to view all reservation options, click the "reserve" button
Preddvor
to view all reservation options, click the "reserve" button
Jezersko
to view all reservation options, click the "reserve" button
Call number – location, accession no. ... Copy status
Kranj-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
Kranj-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
available - outside loan, loan period: 21 days
Kranj-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
Kranj-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
available - outside loan, loan period: 21 days
Cerklje-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
Cerklje-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
on loan - outside loan, due date: 06.09.2024

Expected to be available after: 09.09.2024 (1. in queue)
Kranj-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
Kranj-družinsko branje
O KNJIŽEVNA DELA DO 8 LET moja prva slikanica
HILL E. Piki gre na pot
on loan - outside loan, due date: 24.08.2024

Expected to be available after: 26.08.2024 (1. in queue)
loading ...
loading ...
loading ...