Akademska digitalna zbirka SLovenije - logo
MKK - Public Library of Kranj - all departments (SIKKR)
  • Dobrodošli v Bibji Loki
    Cottey, Éponine
    Type of material - picture book ; children, ages 9-14
    Publication and manufacture - Jezero : Morfemplus, 2023
    Language - slovenian
    ISBN - 978-961-7146-77-6
    COBISS.SI-ID - 137239299

Reserve material at the desired pickup location.

Pickup location Material status Reservation
Stražišče
available - outside loan, loan period: 21 days
Knjižnica24Globus
Parcel box
to view all reservation options, click the "reserve" button
Kranj
to view all reservation options, click the "reserve" button
Naklo
to view all reservation options, click the "reserve" button
Šenčur
available - outside loan, loan period: 21 days
Cerklje
to view all reservation options, click the "reserve" button
Preddvor
to view all reservation options, click the "reserve" button
Jezersko
to view all reservation options, click the "reserve" button
Call number – location, accession no. ... Copy status
Stražišče
O KNJIŽEVNA DELA OD 9 DO 12 LET stripi
COTTEY É. Dobrodošli
Stražišče
O KNJIŽEVNA DELA OD 9 DO 12 LET stripi
COTTEY É. Dobrodošli
available - outside loan, loan period: 21 days
Šenčur
O KNJIŽEVNA DELA OD 9 DO 12 LET stripi
COTTEY É. Dobrodošli
Šenčur
O KNJIŽEVNA DELA OD 9 DO 12 LET stripi
COTTEY É. Dobrodošli
available - outside loan, loan period: 21 days
Kranj
O KNJIŽEVNA DELA DO 8 LET pravljice zgodbe
COTTEY É. Dobrodošli
Kranj
O KNJIŽEVNA DELA DO 8 LET pravljice zgodbe
COTTEY É. Dobrodošli
on loan - outside loan, due date: 22.07.2024

Expected to be available after: 18.07.2024 (1. in queue)
Kranj
O KNJIŽEVNA DELA DO 8 LET pravljice zgodbe
COTTEY É. Dobrodošli
Kranj
O KNJIŽEVNA DELA DO 8 LET pravljice zgodbe
COTTEY É. Dobrodošli
on loan - outside loan, due date: 08.07.2024

Expected to be available after: 18.07.2024 (1. in queue)
Kranj
O KNJIŽEVNA DELA DO 8 LET pravljice zgodbe
COTTEY É. Dobrodošli
Kranj
O KNJIŽEVNA DELA DO 8 LET pravljice zgodbe
COTTEY É. Dobrodošli
on loan - outside loan, due date: 04.07.2024

Expected to be available after: 18.07.2024 (1. in queue)
loading ...
loading ...
loading ...