Akademska digitalna zbirka SLovenije - logo
France Bevk Public Library, Nova Gorica - all departments (SIKNG)
  • Krizolacija : fantastična povest o izoliranih ljudeh
    Podjed, Dan
    Type of material - science fiction (prose) ; adult, general
    Edition - 1. izd.
    Publication and manufacture - Ljubljana : Cankarjeva založba, 2024
    Language - slovenian
    ISBN - 978-961-282-669-7
    COBISS.SI-ID - 189587715

Reserve material at the desired pickup location.

Pickup location Material status Reservation
Potujoča knjižnica
in mobile library 1: available - outside loan, loan period: 76 days
Prvačina
available - outside loan, loan period: 21 days
Centralna knjižnica
on loan - outside loan, due date: 29.07.2024
Expected to be available after: 12.07.2024 (1. in queue)
Centralna - paketnik
on loan - outside loan, due date: 29.07.2024
Expected to be available after: 12.07.2024 (1. in queue)
Miren
on loan - outside loan, due date: 26.07.2024
Expected to be available after: 30.07.2024 (1. in queue)
Renče
on loan - outside loan, due date: 24.07.2024
Expected to be available after: 31.07.2024 (1. in queue)
Šempeter
on loan - outside loan, due date: 25.07.2024
Expected to be available after: 19.08.2024 (2. in queue)
Solkan
reserved, waiting until: 19.07.2024
Expected to be available after: 13.08.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Potujoča knjižnica 821(slv)-312.9 PODJED D. Krizolacija Potujoča knjižnica 821(slv)-312.9 PODJED D. Krizolacija in mobile library 1: available - outside loan, loan period: 76 days
Prvačina 821(slv)-312.9 PODJED D. Krizolacija Prvačina 821(slv)-312.9 PODJED D. Krizolacija available - outside loan, loan period: 21 days
Centralna knjižnica 821(slv)-312.9 PODJED D. Krizolacija Centralna knjižnica 821(slv)-312.9 PODJED D. Krizolacija on loan - outside loan, due date: 29.07.2024

Expected to be available after: 12.07.2024 (1. in queue)
Centralna knjižnica 821(slv)-312.9 PODJED D. Krizolacija Centralna knjižnica 821(slv)-312.9 PODJED D. Krizolacija on loan - outside loan, due date: 11.07.2024

Expected to be available after: 12.07.2024 (1. in queue)
Miren 821(slv)-312.9 PODJED D. Krizolacija Miren 821(slv)-312.9 PODJED D. Krizolacija on loan - outside loan, due date: 26.07.2024

Expected to be available after: 30.07.2024 (1. in queue)
Renče 821(slv)-312.9 PODJED D. Krizolacija Renče 821(slv)-312.9 PODJED D. Krizolacija on loan - outside loan, due date: 24.07.2024

Expected to be available after: 31.07.2024 (1. in queue)
Šempeter 821(slv)-312.9 PODJED D. Krizolacija Šempeter 821(slv)-312.9 PODJED D. Krizolacija on loan - outside loan, due date: 25.07.2024

Expected to be available after: 19.08.2024 (2. in queue)
Solkan 821(slv)-312.9 PODJED D. Krizolacija Solkan 821(slv)-312.9 PODJED D. Krizolacija reserved, waiting until: 19.07.2024

Expected to be available after: 13.08.2024 (1. in queue)
loading ...
loading ...
loading ...