Akademska digitalna zbirka SLovenije - logo
Public Library Miran Jarc Novo mesto - all departments (SIKNM)
  • Zadnje drevo v mestu; Last ... (cover)
    Zadnje drevo v mestu
    Carnavas, Peter
    Type of material - picture book ; primary, ages 5-10
    Publication and manufacture - Hoče : Skrivnost, 2018
    Language - slovenian
    ISBN - 978-961-6936-89-7
    COBISS.SI-ID - 292650240

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Knjižnica Dolenjske Toplice
available - outside loan, loan period: 21 days
Knjižnica Novo mesto
available - outside loan, loan period: 21 days
Knjižnica Novo mesto (24 ur izposoja)
available - outside loan, loan period: 21 days
Knjižnica Straža
available - outside loan, loan period: 21 days
Knjižnica Škocjan
available - outside loan, loan period: 21 days
Knjižnica Dvor
on loan - outside loan, due date: 22.08.2024
Expected to be available after: 26.08.2024 (1. in queue)
Knjižnica Šentjernej
on loan - outside loan, due date: 09.08.2024
Expected to be available after: 13.08.2024 (1. in queue)
Call number – location, accession no. ... Copy status
DOL. TOPLICE
C ZADNJE
IN: 201801230
DOL. TOPLICE
C ZADNJE
IN: 201801230
available - outside loan, loan period: 21 days
ODDELEK ZA MLADINO
C ZADNJE
IN: 201801228
ODDELEK ZA MLADINO
C ZADNJE
IN: 201801228
available - outside loan, loan period: 21 days
STRAŽA
C ZADNJE
IN: 201802686
STRAŽA
C ZADNJE
IN: 201802686
available - outside loan, loan period: 21 days
ŠKOCJAN
C ZADNJE
IN: 201803636
ŠKOCJAN
C ZADNJE
IN: 201803636
available - outside loan, loan period: 21 days
DVOR
C ZADNJE
IN: 201801231
DVOR
C ZADNJE
IN: 201801231
on loan - outside loan, due date: 22.08.2024

Expected to be available after: 26.08.2024 (1. in queue)
ODDELEK ZA MLADINO
C ZADNJE
IN: 201801229
ODDELEK ZA MLADINO
C ZADNJE
IN: 201801229
on loan - outside loan, due date: 14.08.2024

Expected to be available after: 16.08.2024 (1. in queue)
ŠENTJERNEJ
C ZADNJE
IN: 201801232
ŠENTJERNEJ
C ZADNJE
IN: 201801232
on loan - outside loan, due date: 09.08.2024

Expected to be available after: 13.08.2024 (1. in queue)
loading ...
loading ...
loading ...