Akademska digitalna zbirka SLovenije - logo
Public Library Ivan Tavčar Škofja Loka - all departments (SIKSKL)
  • Si že ali še boš? (cover)
    Si že ali še boš?
    Podgoršek, Mojiceja
    Type of material - picture book ; primary, ages 5-10
    Edition - 1. izd.
    Publication and manufacture - Domžale : Epistola, 2018
    Language - slovenian
    ISBN - 978-961-6976-53-4
    COBISS.SI-ID - 293305856

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Škofja Loka
available - outside loan, loan period: 21 days
Škofja Loka, paketnik
Parcel box
available - outside loan, loan period: 21 days
Trata
available - outside loan, loan period: 21 days
Železniki
available - outside loan, loan period: 21 days
Železniki, paketnik
Parcel box
available - outside loan, loan period: 21 days
Žiri
available - outside loan, loan period: 21 days
Žiri, paketnik
Parcel box
available - outside loan, loan period: 21 days
Gorenja Vas
on loan - outside loan, due date: 06.08.2024
Expected to be available after: 07.08.2024 (1. in queue)
Gorenja Vas, paketnik
on loan - outside loan, due date: 06.08.2024
Expected to be available after: 07.08.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Škofja Loka
m C zač.branje PODGORŠEK M. Si že
IN: 400089231
Škofja Loka
m C zač.branje PODGORŠEK M. Si že
IN: 400089231
available - outside loan, loan period: 21 days
Trata
m C zač.branje PODGORŠEK M. Si že
IN: 400089233
Trata
m C zač.branje PODGORŠEK M. Si že
IN: 400089233
available - outside loan, loan period: 21 days
Železniki
m C zač.branje PODGORŠEK M. Si že
IN: 400089234
Železniki
m C zač.branje PODGORŠEK M. Si že
IN: 400089234
available - outside loan, loan period: 21 days
Žiri
m C zač.branje PODGORŠEK M. Si že
IN: 400089235
Žiri
m C zač.branje PODGORŠEK M. Si že
IN: 400089235
available - outside loan, loan period: 21 days
Gorenja vas
m C zač.branje PODGORŠEK M. Si že
IN: 400089232
Gorenja vas
m C zač.branje PODGORŠEK M. Si že
IN: 400089232
on loan - outside loan, due date: 06.08.2024

Expected to be available after: 07.08.2024 (1. in queue)
loading ...
loading ...
loading ...