Akademska digitalna zbirka SLovenije - logo
Public Library Ivan Tavčar Škofja Loka - all departments (SIKSKL)
  • Ne želi si lahke poti (cover)
    Ne želi si lahke poti
    Švigelj-Mérat, Brina
    Type of material - novel ; adult, general
    Publication and manufacture - Novo mesto : Goga, 2021
    Language - slovenian
    ISBN - 978-961-277-289-5
    COBISS.SI-ID - 59078403

    Link(s):

    DobreKnjige

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Gorenja Vas
available - outside loan, loan period: 21 days
Gorenja Vas, paketnik
Parcel box
available - outside loan, loan period: 21 days
Poljane
available - outside loan, loan period: 21 days
Železniki
available - outside loan, loan period: 21 days
Železniki, paketnik
Parcel box
available - outside loan, loan period: 21 days
Žiri
available - outside loan, loan period: 21 days
Žiri, paketnik
Parcel box
available - outside loan, loan period: 21 days
Škofja Loka
on loan - outside loan, due date: 14.08.2024
Expected to be available after: 16.08.2024 (1. in queue)
Škofja Loka, paketnik
on loan - outside loan, due date: 14.08.2024
Expected to be available after: 16.08.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Gorenja vas
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115061
Gorenja vas
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115061
available - outside loan, loan period: 21 days
Poljane
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400125523
Poljane
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400125523
available - outside loan, loan period: 21 days
Železniki
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115062
Železniki
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115062
available - outside loan, loan period: 21 days
Žiri
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115063
Žiri
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115063
available - outside loan, loan period: 21 days
Škofja Loka
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115060
Škofja Loka
o 82-312.6 ŠVIGELJ-M.B. Ne želi
IN: 400115060
on loan - outside loan, due date: 14.08.2024

Expected to be available after: 16.08.2024 (1. in queue)
loading ...
loading ...
loading ...