Akademska digitalna zbirka SLovenije - logo
Public Library of Šmarje - all departments (SIKSMA)
  • V megli; Five go to mystery... (cover)
    V megli
    Blyton, Enid
    Type of material - novel ; children, ages 9-14
    Publication and manufacture - Ljubljana : Mladinska knjiga, 1990
    Language - slovenian
    ISBN - 86-11-04820-2
    COBISS.SI-ID - 21168640

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Bistrica ob Sotli
available - outside loan, loan period: 21 days
Kozje
available - outside loan, loan period: 21 days
Lesično
available - outside loan, loan period: 21 days
Šmarje (centrala)
available - outside loan, loan period: 21 workdays
Podčetrtek
on loan - outside loan, due date: 07.08.2024
Expected to be available after: 12.08.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Bistrica ob Sotli
o P BLYTON Enid V megli
IN: 0102944
Bistrica ob Sotli
o P BLYTON Enid V megli
IN: 0102944
available - outside loan, loan period: 21 days
Kozje
P BLYTON Enid V megli
IN: 0204601
Kozje
P BLYTON Enid V megli
IN: 0204601
available - outside loan, loan period: 21 days
Lesično
P BLYTON Enid V megli
IN: 0302198
Lesično
P BLYTON Enid V megli
IN: 0302198
available - outside loan, loan period: 21 days
Skladišče
o P BLYTON Enid V megli
IN: 0015591
Skladišče
o P BLYTON Enid V megli
IN: 0015591
available - outside loan, loan period: 21 workdays
Skladišče
o P BLYTON Enid V megli
IN: 0015595
Skladišče
o P BLYTON Enid V megli
IN: 0015595
available - outside loan, loan period: 21 workdays
Šmarje
o P BLYTON Enid V megli
IN: 0015594
Šmarje
o P BLYTON Enid V megli
IN: 0015594
available - outside loan, loan period: 21 workdays
Podčetrtek
P BLYTON Enid V megli
IN: 0401193
Podčetrtek
P BLYTON Enid V megli
IN: 0401193
on loan - outside loan, due date: 07.08.2024

Expected to be available after: 12.08.2024 (1. in queue)
Šmarje
o P BLYTON Enid V megli
IN: 0015592
Šmarje
o P BLYTON Enid V megli
IN: 0015592
on loan - outside loan, due date: 25.07.2024

Expected to be available after: 26.07.2024 (1. in queue)
loading ...
loading ...
loading ...