  • The Tunneling Information M...
    Huymajer, Marco; Operta, Dzan; Mazak‐Huemer, Alexandra; Huemer, Christian

    Geomechanik und Tunnelbau, June 2022, 2022-06-00, 20220601, Volume: 15, Issue: 3
    Journal Article

    The documentation of the tunneling process is a crucial task of every tunnel construction project. It provides evidence of the work performed and thus, serves as a basis for invoicing and for several further analyses. Therefore, continuous digitalisation of this documentation is essential. For this purpose, we provide a digital Tunneling Information Management System (TIMS), which is a prototypically implemented software tool for replacing the still common paper‐based documentation process of tunneling projects using the New Austrian Tunneling Method (NATM). The data model presented here defines the data structures managed by this tool. Based on this, the software architecture and the implementation of TIMS is shown. Das Tunneling Information Management System – Ein Werkzeug zur Dokumentation von Tunnelbauprozessen in NÖT Projekten Die Dokumentation des Tunnelbaus ist eine wichtige Aufgabe bei jedem Tunnelbauprojekt. Diese dient dem Nachweis der geleisteten Arbeit und damit als Grundlage für die Rechnungslegung und für verschiedene weitere Auswertungen. Eine durchgängige Digitalisierung dieser Dokumentation ist daher unerlässlich. Zu diesem Zweck stellen wir ein digitales Tunneling Information Management System (TIMS) zur Verfügung. Dabei handelt es sich um ein prototypisch implementiertes Softwaretool, um den immer noch üblichen papierbasierten Dokumentationsprozess von Tunnnelbauprojekten mit Neuer Österreichischen Tunnelbaumethode (NÖT) zu ersetzen. Das vorgestellte Datenmodell definiert die von diesem Tool verwalteten Datenstrukturen. Darauf aufbauend wird die Softwarearchitektur und die Implementierung von TIMS vorgestellt.