VSE knjižnice (vzajemna bibliografsko-kataložna baza podatkov COBIB.SI)
-
Proizvodnost traktora Ecotrac 120V pri privlačenju drva u brdskom području središnje Hrvatske = Productivity of tractor Ecotrac 120V timber skidding in hilly area of Central CroatiaZečić, Željko ...This paper presents the research results of skidder Ecotrac 120V productivity in thinning and final felling half-length wood skidding. Terrain research was conducted using time and motion study at ... two worksites. Worksite A is a mixed stand of beech (48.74%), sessile oak (4.47%), hornbeam (21.06%) and linden (15.65%), aged 57 years, in which thinning was done. Harvesting density was 34.07 m3 /ha, and mean cutting tree was 0.63 m3 . At the worksite B, in the beech (92.03%) stand, aged 111 years, final felling was conducted. Harvesting density was 89.50 m3 /ha, and mean cutting tree was 3.51 m3 . Based on the data collected, the structure of the total time consumption and average daily output was calculated (Table 1). The analysis of recorded delays provided allowance time (Table 2). Differences between load volumes, travel speeds, line pulling and winching speeds and time consumption of individual felling site and landing work elements were investigated by a t-test (Table 3 and Table 4). For those work elements that showed significant differences between worksites, individual mean values were used for further calculations, while for the others, new common mean values were calculated. Travel time consumption was calculated based on the average speed and pertaining skidding distance. A significant difference (t = -3.571562; p = 0.000519) was found between load volumes of thinning (3.050 m3 ) and final felling site (3.717 m3 ). Differences in time consumption (Table 4 and Table 5) are the most obvious in the group of felling site work elements, and they are a consequence of different line pulling/winching distances needed for forming the achieved load volumes. The projected daily output (Fig. 2) of final felling skidding is in average 21% higher than in the thinning skidding with an average 26% lower costs per unit (Fig. 3). Detail analysis of each work element time consumption showed that harvesting density and mean cutting tree volume have an important impact on difference in productivity and costs. Different harvesting densities affect the felling site work time consumption, thus also affecting the achievable productivity. Besides the above mentioned harvesting density, mean cutting tree volume has an even greater influence on skidding productivity because it enables the formation of preferred load volume at short winching distances by choking fewer half-stems, often with the use of just one winch drum. Therefore, it can be concluded that the possibility of achieving greatest outputs, in given stand and harvesting conditions, lies in the optimal relation between the load size and the felling site work time consumpt%ion needed for its formingVir: Nova mehanizacija šumarstva. - ISSN 1845-8815 (Vol. 40, iss. 1, 2019, 10 str.)Vrsta gradiva - članek, sestavni delLeto - 2019Jezik - hrvaškiCOBISS.SI-ID - 5630118
Vnos na polico
Trajna povezava
- URL:
Faktor vpliva
Dostop do baze podatkov JCR je dovoljen samo uporabnikom iz Slovenije. Vaš trenutni IP-naslov ni na seznamu dovoljenih za dostop, zato je potrebna avtentikacija z ustreznim računom AAI.
Leto | Faktor vpliva | Izdaja | Kategorija | Razvrstitev | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Baze podatkov, v katerih je revija indeksirana
Ime baze podatkov | Področje | Leto |
---|
Povezave do osebnih bibliografij avtorjev | Povezave do podatkov o raziskovalcih v sistemu SICRIS |
---|---|
Zečić, Željko | |
Benković, Zlatko | |
Papa, Ivica | |
Marenče, Jurij | 11954 |
Vusić, Dinko |
Vir: Osebne bibliografije
in: SICRIS
Izberite prevzemno mesto:
Prevzem gradiva po pošti
Naslov za dostavo:
Med podatki člana manjka naslov.
Storitev za pridobivanje naslova trenutno ni dostopna, prosimo, poskusite še enkrat.
S klikom na gumb "V redu" boste potrdili zgoraj izbrano prevzemno mesto in dokončali postopek rezervacije.
S klikom na gumb "V redu" boste potrdili zgoraj izbrano prevzemno mesto in naslov za dostavo ter dokončali postopek rezervacije.
S klikom na gumb "V redu" boste potrdili zgoraj izbrani naslov za dostavo in dokončali postopek rezervacije.
Obvestilo
Trenutno je storitev za avtomatsko prijavo in rezervacijo nedostopna. Gradivo lahko rezervirate sami na portalu Biblos ali ponovno poskusite tukaj kasneje.
Gesla v Splošnem geslovniku COBISS
Izbira mesta prevzema
Gradivo iz matične enote je brezplačno. Če je gradivo na mesto prevzema dostavljeno iz drugih enot, lahko knjižnica to storitev zaračuna.
Mesto prevzema | Status gradiva | Rezervacija |
---|
Rezervacija v teku
Prosimo, počakajte trenutek.
Rezervacija je uspela.
Rezervacija ni uspela.
Rezervacija...
Članska izkaznica:
Mesto prevzema: