E-viri
Recenzirano
-
Cheng, D. W.; Ambrosio, G.; Ferracin, P.; Fajardo, L. Garcia; Prestemon, S. O.; Ray, K. L.; Sabbi, G. L.; Solis, M.; Vallone, G.; Wang, X. R.
IEEE transactions on applied superconductivity, 08/2023, Letnik: 33, Številka: 5Journal Article
The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) has, in the recent years, developed assembly specifications for the 4.5 m long MQXFA magnets, which are 150 mm aperture high-field Nb 3 Sn low-β quadrupole magnets that are being built for the CERN Hi-Luminosity LHC (HL-LHC) upgrade. While the specifications were based on lessons learned from the LHC Accelerator Research Program (LARP) effort and the MQXFS and MQXFA prototype magnets, the experience gained from having both MQXFA07 and MQXFA08 magnets not meeting performance specifications during cold testing actually catalyzed a better understanding of the impact of the target assembly specifications and a subsequent refinement of the same. This paper summarizes a body of assembly data from the Pre-Series (MQXFA03-MQXFA07) and Series magnets (MQXFA08-MQXFA11) that have been built to date, and discusses the processes employed to successfully face the challenge of ensuring that the assembly specifications are met for the duration of the project.
Avtor
Vnos na polico
Trajna povezava
- URL:
Faktor vpliva
Dostop do baze podatkov JCR je dovoljen samo uporabnikom iz Slovenije. Vaš trenutni IP-naslov ni na seznamu dovoljenih za dostop, zato je potrebna avtentikacija z ustreznim računom AAI.
Leto | Faktor vpliva | Izdaja | Kategorija | Razvrstitev | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Baze podatkov, v katerih je revija indeksirana
Ime baze podatkov | Področje | Leto |
---|
Povezave do osebnih bibliografij avtorjev | Povezave do podatkov o raziskovalcih v sistemu SICRIS |
---|
Vir: Osebne bibliografije
in: SICRIS
To gradivo vam je dostopno v celotnem besedilu. Če kljub temu želite naročiti gradivo, kliknite gumb Nadaljuj.