Akademska digitalna zbirka SLovenije - logo
E-viri
Celotno besedilo
Recenzirano Odprti dostop
  • The CMS RPC system readines...
    Shopova, M.; Samalan, A.; Tytgat, M.; El Sawy, M.; Alves, G.A.; Marujo, F.; Coelho, E.A.; Da Costa, E.M.; Nogima, H.; Santoro, A.; Fonseca De Souza, S.; De Jesus Damiao, D.; Thiel, M.; Mota Amarilo, K.; Aleksandrov, A.; Hadjiiska, R.; Iaydjiev, P.; Rodozov, M.; Soultanov, G.; Dimitrov, A.; Litov, L.; Pavlov, B.; Petkov, P.; Petrov, A.; Shumka, E.; Qian, S.J.; Kou, H.; Zhao, J.; Song, J.; Hou, Q.; Diao, W.; Cao, P.; Avila, C.; Cabrera, A.; Florez, A.; Fraga, J.; Reyes, J.; Assran, Y.; Mahmoud, M.A.; Mohammed, Y.; Crotty, I.; Laktineh, I.; Grenier, G.; Mirabito, L.; Shchablo, K.; Bagaturia, I.; Lomidze, I.; Tsamalaidze, Z.; Amoozegar, V.; Boghrati, B.; Ebraimi, M.; Zareian, E.; Abbrescia, M.; Iaselli, G.; Pugliese, G.; Loddo, F.; De Filippis, N.; Aly, R.; Ramos, D.; Elmetenawee, W.; Leszki, S.; Paesani, D.; Benussi, L.; Piccolo, D.; Meola, S.; Buontempo, S.; Lista, L.; Paolucci, P.; Fienga, F.; Braghieri, A.; Salvini, P.; Montagna, P.; Riccardi, C.; Vitulo, P.; Asilar, E.; Choi, J.; Kim, T.J.; Choi, S.Y.; Hong, B.; Lee, K.S.; Oh, H.Y.; Goh, J.; Yu, I.; Uribe Estrada, C.; Pedraza, I.; Castilla-Valdez, H.; Sanchez-Hernandez, A.; Fernandez, R.L.; Ramirez-Garcia, M.; Vazquez, E.; Shah, M.A.; Zaganidis, N.; Radi, A.; Hoorani, H.; Muhammad, S.; Ahmad, A.; Asghar, I.; Khan, W.A.; Eysermans, J.; Torres Da Silva De Araujo, F.

    Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment, 07/2023, Letnik: 1052
    Journal Article

    During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 1034 cm−2 s−1 to 7.5 × 1034 cm−2 s−1. To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.