-
Artur : pes, ki je prečkal džunglo, da bi našel domLindnord, Mikael ; Hudson, ValZgodba je resnična, dogaja se leta 2014 na vzdržljivostni dirki po ekvadorski Amazoniji. Že v prvih etapah sedemstokilometerske poti je džungla začela izčrpavati njihovo štiričlansko skupino, vendar ... so kljub mnogim oviram vztrajali. Nekega dne se jim je med počitkom približal velik zanemarjen pes in Mikael je ugotovil, da prav njega nepremično opazuje. Ko so se odpravili naprej, jim je sledil, celo plaval je za njihovimi čolni, čeprav ni dobro znal. Mikael je tedaj s soglasjem ekipe podredil možnost za zmago rešitvi trmastega psa, ki se je očitno odločil biti del njihove ekipe.Type of material - documentary lit ; adult, generalEdition - 1. natisPublication and manufacture - Ljubljana : UMco, 2017Language - slovenianISBN - 978-961-6954-82-2COBISS.SI-ID - 290252032
Author
Lindnord, Mikael |
Hudson, Val
Other authors
Drev, Miriam |
Göransson, Krister
Topics
Lindnord, Mikael, 1976- |
Spomini |
Ekstremni športi |
Tekmovanja |
Južna Amerika |
V leposlovju |
Švedi |
Pustolovščine |
Ekvador |
V leposlovju |
Psi |
Reševanje |
V leposlovju |
Odnosi med človekom in živaljo |
V leposlovju
![loading ... loading ...](themes/default/img/ajax-loading.gif)
Reserve material at the desired pickup location.
Pickup location |
Material status | Reservation |
---|---|---|
Bežigrad |
available - outside loan, loan period: 21 days
|
|
Bežigrad - paketnik |
available - outside loan, loan period: 21 days
|
|
Črnuče |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Črnuče |
on loan - outside loan, due date: 24.07.2024
Expected to be available after: 25.07.2024 (1. in queue) |
|
K. F. Škerla |
available - outside loan, loan period: 21 days
|
|
Glinškova p. |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Glinškova p. |
on loan - outside loan, due date: 24.07.2024
Expected to be available after: 25.07.2024 (1. in queue) |
|
Savsko n. |
available - outside loan, loan period: 21 days
|
|
K. Jurij Vega Dol |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
K. Jurij Vega Dol |
on loan - outside loan, due date: 31.07.2024
Expected to be available after: 01.08.2024 (1. in queue) |
|
K. Otona Župančiča |
available - outside loan, loan period: 21 days
|
|
Po pošti (po ceniku Pošte - cca. 4 eur)
return to Bežigrad |
delivery from another location
available - outside loan, loan period: 21 days
|
|
Fužine |
available - outside loan, loan period: 21 days
|
|
KJM Moste |
available - outside loan, loan period: 21 days
|
|
Polje |
available - outside loan, loan period: 21 days
|
|
Zalog |
available - outside loan, loan period: 21 days
|
|
Jarše |
available - outside loan, loan period: 21 days
|
|
Zadvor |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Zadvor |
on loan - outside loan, due date: 31.07.2024
Expected to be available after: 02.08.2024 (1. in queue) |
|
KJM Moste - paketnik |
available - outside loan, loan period: 21 days
|
|
Polje - paketnik |
available - outside loan, loan period: 21 days
|
|
K. Otona Župančiča - paketnik |
available - outside loan, loan period: 21 days
|
|
Rog |
available - outside loan, loan period: 21 days
|
|
KPV Vič |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
KPV Vič |
on loan - outside loan, due date: 24.07.2024
Expected to be available after: 25.07.2024 (1. in queue) |
|
Šiška |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Šiška |
on loan - outside loan, due date: 22.07.2024
Expected to be available after: 23.07.2024 (1. in queue) |
|
Dobrova |
available - outside loan, loan period: 21 days
|
|
Grba |
available - outside loan, loan period: 21 days
|
|
Škofljica |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Škofljica |
reserved, material is in the reading set
|
|
KPV Vič - paketnik |
to view all reservation options, click the "reserve" button
available - outside loan, loan period: 21 days
|
|
KPV Vič - paketnik |
on loan - outside loan, due date: 24.07.2024
Expected to be available after: 25.07.2024 (1. in queue) |
|
Rudnik |
to view all reservation options, click the "reserve" button
delivery from another location
available - outside loan, loan period: 21 days
|
|
Rudnik |
on loan - outside loan, due date: 15.07.2024
Expected to be available after: 16.07.2024 (1. in queue) |
|
Ig |
available - outside loan, loan period: 21 days
|
|
Ig - paketnik |
available - outside loan, loan period: 21 days
|
|
Podpeč |
available - outside loan, loan period: 21 days
|
|
Gameljne |
on loan - outside loan, due date: 22.08.2024
Expected to be available after: 26.08.2024 (1. in queue) |
|
Šentvid |
on loan - outside loan, due date: 01.08.2024
Expected to be available after: 02.08.2024 (1. in queue) |
|
Šiška - paketnik |
on loan - outside loan, due date: 22.07.2024
Expected to be available after: 23.07.2024 (1. in queue) |
|
Vodice |
on loan - outside loan, due date: 02.08.2024
Expected to be available after: 06.08.2024 (1. in queue) |
|
Črnuče - paketnik |
on loan - outside loan, due date: 24.07.2024
Expected to be available after: 25.07.2024 (1. in queue) |
|
Dol - paketnik |
on loan - outside loan, due date: 31.07.2024
Expected to be available after: 01.08.2024 (1. in queue) |
|
Brezovica |
on loan - outside loan, due date: 19.07.2024
Expected to be available after: 22.07.2024 (1. in queue) |
|
Horjul |
on loan - outside loan, due date: 05.08.2024
Expected to be available after: 07.08.2024 (1. in queue) |
|
Rudnik - paketnik |
on loan - outside loan, due date: 15.07.2024
Expected to be available after: 16.07.2024 (1. in queue) |
|
K. Frana Levstika |
reserved, material is in the reading set
|
![loading ... loading ...](themes/default/img/ajax-loading.gif)
![loading ... loading ...](themes/default/img/ajax-loading.gif)
![loading ... loading ...](themes/default/img/ajax-loading.gif)
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Lindnord, Mikael | ![]() |
Hudson, Val | ![]() |
Drev, Miriam | 91500 |
Göransson, Krister | ![]() |
Select pickup location:
Material pickup by post
Notification
Subject headings in COBISS General List of Subject Headings
Select pickup location
Pickup location | Material status | Reservation |
---|
Please wait a moment.