Palmoplantar pustulosis (PPP) sometimes presents with nail lesions, which affect the patients’ quality of life (QOL). However, little is known about nail lesions in PPP, and there is currently no ...established method for assessing them.
This study aimed to analyze the impact of PPP-related nail lesions with the patients’ QOL. In addition, we considered whether they might constitute a risk factor of pustulotic arthro-osteitis (PAO).’
A total of 178 patients with PPP were enrolled. Among the 178 patients, 66 patients participated in the following quality of life questionnaires; GHQ28, DLQI, and Skindex-16. The severity of the nail lesions was classified according to the Nail Psoriasis Severity Index (NAPSI), and the types of nail lesion were investigated.
The DLQI, Skindex-16 and PPPASI scores were significantly higher in patients with nail lesions than in those without them. Indentions, transverse ridging, and nail thickening were relatively common in PPP. Nail lesions were unrelated to the presence of PAO complications, but leukonychia and discoloration were likely to be related to PAO lesion site.
The study demonstrated that the presence of nail lesions is associated with a decreased QOL regardless of the severity of the skin lesions. The nail lesions were not a risk factor of PAO, but a predictor of skin lesion severity and PAO lesion site. Given this association, indention, transverse ridging, and thickening of the nail, currently not included in the NAPSI, should be added as an assessment item in the evaluation of PPP nail lesions.
•Nail lesions are affected by the severity of skin conditions.•The QOL is related to the presence of nail lesions of palmoplantar pustulosis.•In the absence of nail lesions, the QOL is related to skin lesion severity.•Nail lesions are unlikely to be a risk factor of pustulotic arthro-osteitis.•Nail lesions may impair QOL of palmoplantar pustulosis.
Regarding the debate between the HJC and Ministry of Justice, Nasip Naco said yesterday's event (HJC meeting to fill four court vacancies) is the not the first case for HJC to breach the law. "I have ...appealed for cooperation with HJC. In my capacity as minister I have proposed announcement of vacancies, but it has not happened. We cannot be part of EU unless the law is respected. The lack of transparency by HJC is reflected in the citizens' complaints. The international representatives are already aware of the situation and the citizens see it each passing day,' Justice Minister said.
U radu su prikazani različiti pristupi određivanja mjerodavnog vodostaja za analize funkcionalnih zahtjeva i zahtjeva za stabilnost konstrukcije pri projektiranju hidrotehničkih nasipa i nasutih ...brana retencija i akumulacija. Ukazuje se na različitu praksu pri određivanju mjerodavnih vodostaja u projektiranju, što rezultira različitom pouzdanošću nasutih brana i hidrotehničkih nasipa. Daje se takođern kritički osvrt na pristupe te donose preporuke za pristup definiranju mjerodavnih protoka i vodostaja za analizu stabilnosti.
Under the proposed changes, 21 offences, which are based on their "corruption", will be investigated and judged by the Prosecution of Serious Crimes. Current law "Anti-Mafia," adopted in 2009, aims ...to prevent and fight organized crime and trafficking through preventive measures against property. Ministry of Justice proposed that the changes to the Code of Criminal Procedure are accompanied by an amendment to law No 10192, 03.12.2009 "On preventing and striking at organized crime and trafficking through preventive measures" in order to include offences in the scope of this law.
Tirana, 24 November (ATA) - Minister of Justice Nasip Naco explained Sunday 24 November at a news conference the details of the escape of seven prisoners from high-security jail of Drenove, Korce ...region, and pointed to need of some amendments to law.
Tirana, 9 October (ATA) - Minister of Justice Nasip Naco had a meeting with ambassador of Belgium, Anick Van Calster. "I will ask PM Rama to establish a law reform committee at this ministry, ...including representatives of the magistrates' school and EU experts," minister Naco said.
The book at hand provides an overview of current tendencies in pedestrian bridge construction, of fundamental structural and functional requirements, of the various load-bearing systems, of ...application areas of the various materials and of important economic aspects. Successful real-life examples round out the volume and are meant to provide motivation to make fascinating designs a reality in interdisciplinary collaboration.
Nasip izrađen od zrna dobivenih drobljenjem meke stijene može biti podložan dodanom slijeganju uzrokovanim raspucavanjem zrna unutar strukture nasipa. Ovo dodatno slijeganje nije uzrokovano promjenom ...stanja naprezanja unutar nasipa i ne može biti procijenjeno standardnim metodama proračuna na osnovi modula stišljivosti izmjerenog nakon zbijanja nasipa. Raspucavanje zrna je uzrokovano procesom rastrošbe, koji je u mekim stijenama kao što je lapor, uglavnom uzrokovan procesom sušenja i vlaženja. Ako su zrna u strukturi nasipa podvrgnuta sušenju i vlaženju, rezultat je usitnjavanje zrna do razine raspada u materijal koji se može opisati kao tlo. Usitnjeni materijal odvaja se od zrna i popunjava makro pore u strukturi nasipa što za posljedicu ima dodatno slijeganje nasipa. Uzorci za ispitivanje su izrađeni od drobljenog lapora u laboratorijskim uvjetima. Ispitivanje je provedeno sa modificiranim edometarskim uređajem. Izmjerene veličine se mogu iskoristiti u svrhu procjene dodatnog slijeganja nasipa uzrokovanog rastrošbom.
Nasipi za obranu od poplava su geotehničke građevine. One su bitne građevine za zaštitu ljudskih života i materijalnih dobara. Eurocode 7: Geotehničko projektiranje-dio 1.: Opća pravila, o njima ne ...vodi dovoljno računa. Projektanti su dužni pridržavati se naputaka iz ovog propisa, a oni se nalaze u nekoliko poglavlja EC7/1, što za projektante može djelovati zbunjujuće.
Ovim radom nastojalo se pomoći projektantima pri projektiranju i dimenzioniranu nasipa za obranu od poplava prema Eurokodu 7. Manjkavost EC7 u odnosu na nasipe za obranu od poplava uočila je i grupa za praćenje projekta pod nazivom „International Levee Handbook (ILH)“ (CIRIA C731, (2013.), te je za potrebe Ujedinjenog Kraljevstva i Irske izradila 2014. godine nacionalne upute pod nazivom “Primjena Eurokoda 7 na projektiranje nasipa za obranu od poplava” (dostupne na internetu). Tekst koji slijedi nije prijevod tog rada niti ga opisuje.