NUK - logo
Public Library of Domžale - all departments (SIKDOM)
  • Pot modrosti; El camino de ... (cover)
    Pot modrosti
    Bucay, Jorge
    Type of material - book ; adult, serious
    Edition - 1. izd., 1. natis
    Publication and manufacture - Ljubljana : Mladinska knjiga, 2024
    Language - slovenian
    ISBN - 978-961-01-7626-8
    COBISS.SI-ID - 192429827

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Moravče
available - outside loan, loan period: 14 days
Moravče, paketnik
Parcel box
available - outside loan, loan period: 14 days
Šentvid pri Lukovici
available - outside loan, loan period: 14 days
Šentvid, paketnik
Parcel box
available - outside loan, loan period: 14 days
Trzin
available - outside loan, loan period: 14 days
Domžale
on loan - outside loan, due date: 23.09.2024
Expected to be available after: 20.09.2024 (1. in queue)
Mengeš
on loan - outside loan, due date: 24.09.2024
Expected to be available after: 25.09.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Moravče
ol 82-3 špa BUCAY J. Pot
IN: 0220240450
Moravče
ol 82-3 špa BUCAY J. Pot
IN: 0220240450
available - outside loan, loan period: 14 days
Šentvid pri Lukovici
ol 82-3 špa BUCAY J. Pot
IN: 0320240450
Šentvid pri Lukovici
ol 82-3 špa BUCAY J. Pot
IN: 0320240450
available - outside loan, loan period: 14 days
Trzin
ol 82-3 špa BUCAY J. Pot
IN: 0520240587
Trzin
ol 82-3 špa BUCAY J. Pot
IN: 0520240587
available - outside loan, loan period: 14 days
Domžale
ol 82-3 špa BUCAY J. Pot
IN: 0020242295
Domžale
ol 82-3 špa BUCAY J. Pot
IN: 0020242295
on loan - outside loan, due date: 23.09.2024

Expected to be available after: 20.09.2024 (1. in queue)
Domžale
os 82-3 špa BUCAY J. Pot
IN: 0020242296
Domžale
os 82-3 špa BUCAY J. Pot
IN: 0020242296
on loan - outside loan, due date: 19.09.2024

Expected to be available after: 20.09.2024 (1. in queue)
Mengeš
ol 82-3 špa BUCAY J. Pot
IN: 0120240680
Mengeš
ol 82-3 špa BUCAY J. Pot
IN: 0120240680
on loan - outside loan, due date: 24.09.2024

Expected to be available after: 25.09.2024 (1. in queue)
loading ...
loading ...
loading ...