NUK - logo
Public Library Miran Jarc Novo mesto - all departments (SIKNM)
  • Luna in mesečev zajec
    Whitcher, Camille
    Type of material - picture book ; pre-primary, ages 0-5
    Edition - 1. natis
    Publication and manufacture - Ljubljana : Hiša knjig, HKZ, 2022
    Language - slovenian
    ISBN - 978-961-7172-32-4
    COBISS.SI-ID - 102567171

Reserve material at the desired pickup location.

Pickup location Material status Reservation
Potujoča knjižnica
in mobile library 1: available - outside loan, loan period: 28 days
Knjižnica Dolenjske Toplice
available - outside loan, loan period: 21 days
Knjižnica Dvor
available - outside loan, loan period: 21 days
Knjižnica Novo mesto
available - outside loan, loan period: 21 days
Knjižnica Novo mesto (24 ur izposoja)
available - outside loan, loan period: 21 days
Knjižnica Straža
available - outside loan, loan period: 21 days
Knjižnica Škocjan
available - outside loan, loan period: 21 days
Knjižnica Šentjernej
on loan - outside loan, due date: 30.08.2024
Expected to be available after: 02.09.2024 (1. in queue)
Call number – location, accession no. ... Copy status
POTUJOČA KNJIŽNICA
C LUNA
IN: 202206396
POTUJOČA KNJIŽNICA
C LUNA
IN: 202206396
in mobile library 1: available - outside loan, loan period: 28 days
DOL. TOPLICE
C LUNA
IN: 202206393
DOL. TOPLICE
C LUNA
IN: 202206393
available - outside loan, loan period: 21 days
DVOR
C LUNA
IN: 202206392
DVOR
C LUNA
IN: 202206392
available - outside loan, loan period: 21 days
ODDELEK ZA MLADINO
C LUNA
IN: 202206395
ODDELEK ZA MLADINO
C LUNA
IN: 202206395
available - outside loan, loan period: 21 days
ODDELEK ZA MLADINO
C LUNA
IN: 202206394
ODDELEK ZA MLADINO
C LUNA
IN: 202206394
available - outside loan, loan period: 21 days
STRAŽA
C LUNA
IN: 202206391
STRAŽA
C LUNA
IN: 202206391
available - outside loan, loan period: 21 days
ŠKOCJAN
C LUNA
IN: 202206390
ŠKOCJAN
C LUNA
IN: 202206390
available - outside loan, loan period: 21 days
ŠENTJERNEJ
C LUNA
IN: 202206389
ŠENTJERNEJ
C LUNA
IN: 202206389
on loan - outside loan, due date: 30.08.2024

Expected to be available after: 02.09.2024 (1. in queue)
loading ...
loading ...
loading ...