NUK - logo
Public Library Miran Jarc Novo mesto - all departments (SIKNM)
  • Kremeljski mag; Le mage du ... (cover)
    Kremeljski mag
    Da Empoli, Giuliano
    Type of material - novel ; adult, general
    Edition - 1. izd.
    Publication and manufacture - Ljubljana : Mladinska knjiga, 2024
    Language - slovenian
    ISBN - 978-961-01-7535-3
    COBISS.SI-ID - 183737347

    Link(s):

    DobreKnjige

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Knjižnica Škocjan
available - outside loan, loan period: 21 days
Potujoča knjižnica
in mobile library 1: on loan - outside loan, due date: 24.09.2024
Expected to be available after: 25.09.2024 (1. in queue)
Knjižnica Dolenjske Toplice
on loan - outside loan, due date: 26.08.2024
Expected to be available after: 28.08.2024 (1. in queue)
Knjižnica Dvor
on loan - outside loan, due date: 03.09.2024
Expected to be available after: 04.09.2024 (1. in queue)
Knjižnica Novo mesto
on loan - outside loan, due date: 04.09.2024
Expected to be available after: 05.09.2024 (1. in queue)
Knjižnica Straža
on loan - outside loan, due date: 30.08.2024
Expected to be available after: 02.09.2024 (1. in queue)
Knjižnica Šentjernej
on loan - outside loan, due date: 23.08.2024
Expected to be available after: 27.08.2024 (1. in queue)
Call number – location, accession no. ... Copy status
ŠKOCJAN
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404639
ŠKOCJAN
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404639
available - outside loan, loan period: 21 days
POTUJOČA KNJIŽNICA
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404641
POTUJOČA KNJIŽNICA
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404641
in mobile library 1: on loan - outside loan, due date: 24.09.2024

Expected to be available after: 25.09.2024 (1. in queue)
DOL. TOPLICE
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404606
DOL. TOPLICE
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404606
on loan - outside loan, due date: 26.08.2024

Expected to be available after: 28.08.2024 (1. in queue)
DVOR
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404607
DVOR
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404607
on loan - outside loan, due date: 03.09.2024

Expected to be available after: 04.09.2024 (1. in queue)
ODDELEK ZA ODRASLE
DA EMPOLI G. Kremeljski
IN: 202404604
ODDELEK ZA ODRASLE
DA EMPOLI G. Kremeljski
IN: 202404604
on loan - outside loan, due date: 04.09.2024

Expected to be available after: 05.09.2024 (1. in queue)
STRAŽA
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404640
STRAŽA
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404640
on loan - outside loan, due date: 30.08.2024

Expected to be available after: 02.09.2024 (1. in queue)
ŠENTJERNEJ
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404638
ŠENTJERNEJ
821-311.2 DA EMPOLI G. Kremeljski
IN: 202404638
on loan - outside loan, due date: 23.08.2024

Expected to be available after: 27.08.2024 (1. in queue)
ODDELEK ZA ODRASLE
DA EMPOLI G. Kremeljski
IN: 202404605
ODDELEK ZA ODRASLE
DA EMPOLI G. Kremeljski
IN: 202404605
reserved, waiting until: 16.08.2024

Expected to be available after: 05.09.2024 (1. in queue)
loading ...
loading ...
loading ...