Jorgensen, Magne
IEEE software, 03/2014, Volume: 31, Issue: 2Journal Article
Unrealistic project plans and cost overruns create problems for software professionals and their clients. In spite of much research and numerous attempts to learn from experience, the problem of inaccurate, frequently overoptimistic cost estimates hasn't been solved. This article summarizes some knowledge that could improve the estimation accuracy, but we still lack some knowledge that hinders us from being able to produce accurate estimates.
Author
![loading ... loading ...](themes/default/img/ajax-loading.gif)
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
If the library membership card is not in the list,
add a new one.
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|
Source: Personal bibliographies
and: SICRIS
The material is available in full text. If you wish to order the material anyway, click the Continue button.