Using simulations and analytical approaches, we have studied single hit resolutions obtained with a binary readout, which is often proposed for high granularity detectors to reduce the generated data ...volume. Our simulations considering several parameters (e.g. strip pitch) show that the detector geometry and an electronics parameter of the binary readout chips could be optimized for binary readout to offer an equivalent spatial resolution to the one with an analog readout. To understand the behavior as a function of simulation parameters, we developed analytical models that reproduce simulation results with a few parameters. The models can be used to optimize detector designs and operation conditions with regard to the spatial resolution.
Study of the spatial resolution for binary readout detectors Yonamine, R.; Maerschalk, T.; Lentdecker, G. De
Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment,
07/2016, Letnik:
824
Journal Article
Recenzirano
Often the binary readout is proposed for high granularity detectors to reduce the generated data volume to be readout at the price of a somewhat reduced spatial resolution compared to an analogue ...readout. We have been studying single hit resolutions obtained with a binary readout using simulations as well as analytical approaches. In this note we show that the detector geometry could be optimized to offer an equivalent spatial resolution than with an analogue readout.
Inside an IBA proton therapy centre, secondary neutrons are produced due to nuclear interactions of the proton beam with matter mainly inside the cyclotron, the beam line, the treatment nozzle and ...the patient. Accurate measurements of the neutron ambient dose equivalent H*(10) in such a facility require the use of a detector that has a good sensitivity for neutrons ranging from thermal energies up to 230 MeV, such as for instance the WENDI-2 detector. WENDI-2 measurements have been performed at the Westdeutsches Protonentherapiezentrum Essen, at several positions around the cyclotron room and around a gantry treatment room operated in two different beam delivery modes: Pencil Beam Scanning and Double Scattering. These measurements are compared with Monte Carlo simulation results for the neutron H*(10) obtained with MCNPX 2.5.0 and GEANT4 9.6.
An analog front-end in 130 (nm) CMOS technology was developed for the readout of triple-GEM detectors in the CMS experiment at CERN. The front-end has programmable peaking time - 15, 25, 35 and 45 ...(ns) - and gain - 48, 16.4 and 8.6 (mV/fC) - and is able to support a detector capacitance ranging from 0 to 120 (pF). In the design, many optimization techniques have been used to minimize the power consumption for given noise and timing requirements. Consequently, a single front-end channel consumes 790 (μA), and achieves an equivalent noise chargeof 620 (e-) at 0 (pF) detector capacitance with a noise slope of 33 (e-/pF). In order to simplify the peaking time programmability, an OTA-C based shaperwas used in the analog chain. The entire design hasbeen made radiation hard against TID. A chip comprising 129 front-end channels was fabricated and tested.
The CMS Collaboration has been developing large-area triple-gas electron multiplier (GEM) detectors to be installed in the muon Endcap regions of the CMS experiment in 2019 to maintain forward muon ...trigger and tracking performance at the High-Luminosity upgrade of the Large Hadron Collider (LHC); 10 preproduction detectors were built at CERN to commission the first assembly line and the quality controls (QCs). These were installed in the CMS detector in early 2017 and participated in the 2017 LHC run. The collaboration has prepared several additional assembly and QC lines for distributed mass production of 160 GEM detectors at various sites worldwide. In 2017, these additional production sites have optimized construction techniques and QC procedures and validated them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we discuss how the QCs make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented with details of the assembly sites involvement.