NUK - logo
E-viri
Celotno besedilo
Recenzirano
  • Recommissioning of JYFLTRAP...
    Kolhinen, V.S.; Eronen, T.; Gorelov, D.; Hakala, J.; Jokinen, A.; Jokiranta, K.; Kankainen, A.; Koikkalainen, M.; Koponen, J.; Kulmala, H.; Lantz, M.; Mattera, A.; Moore, I.D.; Penttilä, H.; Pikkarainen, T.; Pohjlainen, I.; Reponen, M.; Rinta-Antila, S.; Rissanen, J.; Rodríguez Triguero, C.; Rytkönen, K.; Saastamoinen, A.; Solders, A.; Sonnenschein, V.; Äystö, J.

    Nuclear instruments & methods in physics research. Section B, Beam interactions with materials and atoms, 12/2013, Letnik: 317, Številka: Part B
    Journal Article

    •The JYFLTRAP system has been moved to a new location and commissioned.•The line between RFQ and the Penning traps allows implementation of extra devices.•The RFQ cooler/buncher and both Penning traps are operational.•The buffer-gas cooling method and the excitations in the purification trap works.•TOF-ICR technique in the precision trap works. A resonance picture shown. The JYFLTRAP double Penning-trap system was moved to a new location along with the Ion Guide Isotope Separator On-line (IGISOL) facility at the Accelerator Laboratory of the University of Jyväskylä. The move made it possible to upgrade various parts of the facility. For example, separate beam lines for JYFLTRAP and the collinear laser spectroscopy station were constructed after the radio-frequency quadrupole cooler and buncher. In this contribution we give an overview of the new JYFLTRAP facility and results from the first stable ion-beam tests.