NUK - logo
E-viri
Celotno besedilo
Recenzirano Odprti dostop
  • Rehabilitation of the lands...
    Rajković, Radmilo; Kržanović, Daniel; Mikić, Miomir; Požega, Emina

    Mining and Metallurgy Engineering Bor, 2022, Letnik: 2022, Številka: 2
    Journal Article

    The "Landfill 3" was formed at the location of the flotation tailing dump "Čukaru Peki", where the earthen material, created during the dam construction of the flotation tailing dump was placed. A part of the deposited material and substrate at this landfill has slipped that endangers the local road and "Kusak" stream at the landfill foot. That is why this landslide needs to be rehabilitated.