NUK - logo
E-viri
Recenzirano Odprti dostop
  • Construction and beam commi...
    Takahashi, H; Agari, K; Hirose, E; Ieiri, M; Katoh, Y; Kiyomichi, A; Minakawa, M; Muto, R; Naruki, M; Noumi, H; Sato, Y; Sawada, S; Shirakabe, Y; Suzuki, Y; Takasaki, M; Tanaka, K H; Toyoda, A; Watanabe, H; Yamanoi, Y

    Journal of physics. Conference series, 09/2011, Letnik: 312, Številka: 5
    Journal Article

    The new facility J-PARC has been constructed in Tokai, Japan. It aims at providing intense proton beams of 750 kW for next-generation particle and nuclear physics experiments. The Hadron Experimental Hall (HD-hall) is one of the two facilities at the J-PARC Main Ring and utilizes various secondary particles produced by the slowly extracted primary proton beam. We have constructed two charged and one neutral secondary beam lines. The K1.8 beam line transports separated charged secondaries with the maximum momentum of 2 GeV/c. Secondary particles are purified by two electrostatic separators (ESSs). The K1.8BR beam line is branched from the K1.8 at the bending magnet downstream of the first ESS. The K1.8BR delivers separated charged beams with the momentum up to 1.2 GeV/c. On January 27th, 2009, the first beam was successfully extracted to the HD-hall and transported to the beam dump. The first secondary beam extraction to the K1.8BR beam line succeeded in February 2009. The beam commissioning of the K1.8 and KL beam lines started in October 2009.