-
Advanced construction progress management with BEXEL Manager : master thesis No.: 236/II. GR-BIM = Napredno upravljanje spremljave napredka del z okoljem Bexel Manager : [magistrsko delo]Rodrigues, Iuri GonçalvesThe digitalization of the construction sector is seen by several international organs and policy makers as inevitable and vital for the Architecture, Engineering and Construction Industry prosperity ... and sustainability. Its benefits span from the enhancement of current practices to the integration of disruptive tools and technologies allowing the emergence of new and improved processes. The progress management process is an essential part of the construction projects that analysis and manages the performance of works developed proving to be key in avoiding time and costs overrun, delivering projects efficiently. One of the main aspects of efficient project management that enables an accurate process of decision making is the ability to analyse as-built and as-planned progress information discrepancies and communicate it in a clear way. This study focuses on exploring the automation of construction progress management by identifying new technologies and methods of retrieving and use information required, and how to process this information to analyse earned value and delays of the construction project in an ongoing manner, controlling its performance, and taking advantage of the integration of Building Information Modeling (BIM), project management tools and software. The dissertation includes the design of a framework using BIM and the project management software Bexel Manager to manage the construction progress and applies it to a use-case scenario to ultimately assess it in terms of costs and times performance through key performance indicators (KPI).Type of material - master's thesis ; adult, seriousPublication and manufacture - Ljubljana : [I. G. Rodrigues], 2022Language - englishCOBISS.SI-ID - 126108675
Author
Rodrigues, Iuri Gonçalves
Other authors
Cerovšek, Tomo |
Janjić, Veljko
Topics
civil engineering |
master thesis |
BIM |
construction management |
construction works |
progress monitoring |
earned value analysis |
machine learning |
gradbeništvo |
magistrska dela |
GR |
BIM |
vodenje projektov |
gradbena dela |
strojno učenje |
analiza EVA |
spremljanje napredka
Library/institution |
City | Acronym | For loan | Other holdings |
---|---|---|---|---|
Faculty of Civil and Geodetic Engineering, Ljubljana | Ljubljana | FGGLJ |
reading room 1 cop.
|
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Rodrigues, Iuri Gonçalves | |
Cerovšek, Tomo | 18683 |
Janjić, Veljko |
Select pickup location:
Material pickup by post
Notification
Subject headings in COBISS General List of Subject Headings
Select pickup location
Pickup location | Material status | Reservation |
---|
Please wait a moment.