-
Evolution of the NPP Krško safety assessment due to seismic hazardUršič, Mitja, 1976- ...The hazard of seismic event was recognised during the design and construction phase of the NPP Krško. Due to this the NPP Krško was designed and constructed as a robust, seismically resistant plant. ... In the recent years extensive studies of the plant region have been performed. Studies resulted in the new probabilistic seismic hazard assessment (PSHA). Due to findings in the new PSHA study a complete update of the seismic probabilistic safety assessment (SPSA) of NPP Krško was conducted. Results of SPSA show significant decrease of the core damage frequency in the NPP Krško SPSA model. The changes and refinements in the SPSA model have more than compensated the effects of increased seismic risk.Source: Conference proceedings [Elektronski vir] (Str. 126.1-126.9)Type of material - conference contribution ; adult, seriousPublish date - 2005Language - englishCOBISS.SI-ID - 353776
Author
Uršič, Mitja, 1976- |
Stritar, Andrej |
Vojnović, Djordje |
Mühleisen, Artur
Topics
Nuclear power plants |
Jedrske elektrarne |
Krsko reactor |
NEK |
Safety |
Varnost |
Risk assessment |
Ocena tveganja |
Seismology |
Seizmologija |
Risk analysis |
Analiza tveganja |
Data |
Podatki |
Slovenia |
Slovenija
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Uršič, Mitja, 1976- | 29182 |
Stritar, Andrej | 07989 |
Vojnović, Djordje | 05983 |
Mühleisen, Artur | 11141 |
Select pickup location:
Material pickup by post
Notification
Subject headings in COBISS General List of Subject Headings
Select pickup location
Pickup location | Material status | Reservation |
---|
Please wait a moment.