ALL libraries (COBIB.SI union bibliographic/catalogue database)
-
Cost benefit analysis of SINCRO.GRID project : študija št. 2342Omahen, Gregor, 1978- ; Kernjak Jager, MajaTransmission System Operators are responsible far the security of operations, facilitation of regional markets and integration of RES. Thus, the development of grid infrastructure, supporting ... technologies and market mechanisms are key elements far a proper and timely integration of renewables. In addition, TSOs also address network ageing issues and weather related risks with technical solutions which keep the electric system secure at acceptable costs. In recent years, the Slovenian and Croatian electricity systems have been increasingly challenged by faur contradictory influences impacting the operations of both electricity systems: l. A constant support ofRES integration to meet the EU ambitions 2. A lower electricity consumption due to the economic crisis, 3. A growing Jack of centralized electricity generation able to provide ancillary services, 4. The high interconnectivity between the neighboring control zones. Consequently, the Slovenian and Croatian TSOs, together with DSOs, observe growing network overvoltage issues as well as a decrease in secondary reserve capacities. The security of supply is therefare at stake which, in turn, impact further national and regional RES integration targets. The Slovenian and Croatian TSOs and DSOs started separately addressing these issues in 2014. Classical engineering approaches were taken into account in the two existing TYNDPs. They studied first the implementation of technical measures within each control zone, but soon came to the conclusion that: uncoordinated actions, taken in one of the two control zones would significantly impact the other since these two control zones are highly interconnected; a progressive deployment of technological solutions would be less efficient since the same issues would resurface soon, leading to repeated investments in order to keep the security of operation above critical bottom line figures; in the long-run, uncoordinated approach would not lead to a satisfactory level of security of operation while allowing far hosting higher levels of RES integration and maintaining a sufficient level of ancillary services in both electricity systems. Therefore, joint actions would create synergies and address the very same issues in a more sustainable way. The TSOs and DSOs therefore agreed to work together to address all the pending issues and designed a joint cross-border systemic approach to bring lasting solutions to all of the four above issues at once. They end up with the SINCRO.GRID investment project: it is an innovative system integration of several mature technology components where synergies among all the proposed solutions are searched to maximize the investment impact onto both electric systems, while creating further regional benefits. SINCRO.GRID will deliver an increased security of operation to reach acceptable levels for at least the next ten years, this with no need for repeated investments to maintain this acceptable security level, while hosting levels of RES foreseen to reach the 2030 targets in an integrated and competitive market. The SINCRO.GRID project integrates new active elements in the transmission and distribution grids which are managed via a virtual cross-border control center involving advanced data management, common system optimization and generation/consumption forecasting, thanks to an increased cross-border cooperation between TSOs and DSOs. The project leans on five main pillars as described in the following table. The project's investment costs amount to 88.6 M EUR.Type of material - treatise, study ; adult, seriousPublication and manufacture - Ljubljana : Elektroinštitut Milan Vidmar, 2018Language - englishCOBISS.SI-ID - 39506437
Author
Omahen, Gregor, 1978- |
Kernjak Jager, Maja
Topics
energetika |
elektrotehnika |
električni sistemi |
varnost |
varnostni sistemi
![loading ... loading ...](themes/default/img/ajax-loading.gif)
No library within the COBISS.SI system holds a copy of this material.
![loading ... loading ...](themes/default/img/ajax-loading.gif)
![loading ... loading ...](themes/default/img/ajax-loading.gif)
![loading ... loading ...](themes/default/img/ajax-loading.gif)
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
If the library membership card is not in the list,
add a new one.
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Omahen, Gregor, 1978- | 26184 |
Kernjak Jager, Maja | 29798 |
Source: Personal bibliographies
and: SICRIS
Select pickup location:
Material pickup by post
Delivery address:
Address is missing from the member's data.
The address retrieval service is currently unavailable, please try again.
By clicking the "OK" button, you will confirm the pickup location selected above and complete the reservation process.
By clicking the "OK" button, you will confirm the above pickup location and delivery address, and complete the reservation process.
By clicking the "OK" button, you will confirm the address selected above and complete the reservation process.
Notification
Automatic login and reservation service currently not available. You can reserve the material on the Biblos portal or try again here later.
Subject headings in COBISS General List of Subject Headings
Select pickup location
The material from the parent unit is free. If the material is delivered to the pickup location from another unit, the library may charge you for this service.
Pickup location | Material status | Reservation |
---|
Reservation in progress
Please wait a moment.
Reservation was successful.
Reservation failed.
Reservation...
Membership card:
Pickup location: