-
A business process re-engineering using BIM tools and APIs : master thesis no.: 212/II. GR-BIM = Reinženiring poslovnih procesov z uporabo orodij BIM in aplikacijskih vmesnikov : [magistrsko delo]Starc, AndražDigitalization has been a growing trend in the construction industry for many years. Even though the construction industry has been slow to adopt new processes and technology innovations, ... digitalization is now accelerating and building information modelling is regarded as its backbone. To adopt new technologies and digitalization, engineering and consulting companies have to re-engineer their business processes. This work focuses on the re-engineering of the quantity takeoff process. The goal is to digitalize the traditional quantity takeoff process using BIM. The presented business process re-engineering is done adopting existing guidelines, recommendations and methodologies from the experts in the field. First, the existing AS-IS process is captured, modelled and analyzed. Three alternative solutions are proposed and evaluated. The chosen solution for the re-engineered BIM-based quantity takeoff process proposes implementing a new, specialized application software, standardization of process inputs, outputs and workflows, controlled vocabulary and development of custom solutions using Revit API to address specific challenges. The TO-BE process is defined, modelled and implemented through a variety of developments. The reengineered process is successfully applied to a case study of an existing project following the defined TO-BE process model, accommodating all critical success factors. The whole process was executed in a single, digital environment. The number of model-based items in the bill of quantities increased from approximately 20% in the existing process to approximately 70% in the re-engineered process. While there is still room for continuous process improvement, the analysis of the case study suggests that the re-engineered process is much more reliable, time-efficient, better in managing changes, and the overall process control is improved.Type of material - master's thesis ; adult, seriousPublication and manufacture - Ljubljana : [A. Starc], 2021Language - englishCOBISS.SI-ID - 79300867
Author
Starc, Andraž
Other authors
Cerovšek, Tomo |
Sinur, Franc, 1982-
Topics
civil engineering |
master thesis |
BIM |
business process re-engineering |
API |
quantity takeoff |
process model |
gradbeništvo |
magistrska dela |
GR |
BIM |
reinženiring poslovnih procesov |
Dynamo |
Revit |
API |
popis količin |
procesni model
Library/institution |
City | Acronym | For loan | Other holdings |
---|---|---|---|---|
Faculty of Civil and Geodetic Engineering, Ljubljana | Ljubljana | FGGLJ |
reading room 1 cop.
|
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Starc, Andraž | |
Cerovšek, Tomo | 18683 |
Sinur, Franc, 1982- | 28349 |
Select pickup location:
Material pickup by post
Notification
Subject headings in COBISS General List of Subject Headings
Select pickup location
Pickup location | Material status | Reservation |
---|
Please wait a moment.