ALL libraries (COBIB.SI union bibliographic/catalogue database)
  • BIM workflow for pre-construction constructability evaluation using 4D tasks : master thesis No.: 209/II. GR-BIM = Delotok BIM za pred-izvedbeno presojo izvedljivosti z uporabo aktivnosti 4D : [magistrsko delo]
    Naghavi, Sajedeh
    The planning and scheduling of construction projects depends on technological and temporal constraints of construction activities within the frame of time, location, specific requirements, etc. The ... constraints determine the construction processes and their relationships that result in construction activities. Then, the construction activities define and require exclusive access to certain spaces at the construction site. Availability of these spaces often depends on the progress of construction. When these constraints, relationships and dependencies and their required spaces are not adequately considered for construction scheduling and during the process, they may cause conflicts at the construction site with the consequences of incalculable delays and extra costs. Nowadays, construction scheduling can be supported by discrete event simulation based on building information models (BIM). Yet further details from construction site plan and equipment and resources are required to compliment the information provided by building information models and required for construction scheduling. The focus of this research is on the clarification of constraints and suggest an efficient construction workflow in BIM. For an efficient construction simulation, data has to be extracted from underlying data resources like models, stakeholders, project managers, standard tables, etc. and enhanced with additional process information. Data preparation and its integration with the building model into simulation is done with the aid of an interactive mediator for construction simulation resulting in an activity loaded model. The activity model has task-boxes surrounding building elements representing the required space for the activities to construct each element in the building. Later, an evaluation process for the simulated construction activities to their optimization are held by assessing the in-task clashes among simulated activities (Marx and Markus König, 2011). This evaluation can alert project managers on the workflow and requirements of the construction site at pre-construction phase. In fact, constructability of the project is being organised by BIM-on-site.
    Type of material - master's thesis ; adult, serious
    Publication and manufacture - Ljubljana : [S. Naghavi], 2021
    Language - english
    COBISS.SI-ID - 79401731

Library/institution City Acronym For loan Other holdings
Faculty of Civil and Geodetic Engineering, Ljubljana Ljubljana FGGLJ reading room 1 cop.
loading ...
loading ...
loading ...