France Bevk Public Library, Nova Gorica - all departments (SIKNG)
  • Volkec išče svoj dom
    Bright, Rachel
    Type of material - picture book ; primary, ages 5-10
    Publication and manufacture - Jezero : Morfemplus, 2023
    Language - slovenian
    ISBN - 978-961-7146-53-0
    COBISS.SI-ID - 113129731

Digital content: dCOBISS

preview

png


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Centralna knjižnica
available - outside loan, loan period: 21 days
Centralna - paketnik
Parcel box
available - outside loan, loan period: 21 days
Kanal
available - outside loan, loan period: 21 days
Miren
available - outside loan, loan period: 21 days
Potujoča knjižnica
in mobile library 1: available - outside loan, loan period: 76 days
Prvačina
available - outside loan, loan period: 21 days
Renče
available - outside loan, loan period: 21 days
Šempeter
available - outside loan, loan period: 21 days
Call number – location, accession no. ... Copy status
Centralna knjižnica C BRIGHT R. Volkec Centralna knjižnica C BRIGHT R. Volkec available - outside loan, loan period: 21 days
Kanal C BRIGHT R. Volkec Kanal C BRIGHT R. Volkec available - outside loan, loan period: 21 days
Miren C BRIGHT R. Volkec Miren C BRIGHT R. Volkec available - outside loan, loan period: 21 days
Potujoča knjižnica C BRIGHT R. Volkec Potujoča knjižnica C BRIGHT R. Volkec in mobile library 1: available - outside loan, loan period: 76 days
Prvačina C BRIGHT R. Volkec Prvačina C BRIGHT R. Volkec available - outside loan, loan period: 21 days
Renče C BRIGHT R. Volkec Renče C BRIGHT R. Volkec available - outside loan, loan period: 21 days
Šempeter C BRIGHT R. Volkec Šempeter C BRIGHT R. Volkec available - outside loan, loan period: 21 days
Centralna knjižnica C BRIGHT R. Volkec Centralna knjižnica C BRIGHT R. Volkec on loan - outside loan, due date: 17.07.2024

Expected to be available after: 02.08.2024 (1. in queue)
Centralna knjižnica C BRIGHT R. Volkec Centralna knjižnica C BRIGHT R. Volkec on loan - outside loan, due date: 17.07.2024

Expected to be available after: 02.08.2024 (1. in queue)
loading ...
loading ...
loading ...