National Building and Civil Engineering Institute, Lj (ZAGLJ)
  • BIM based integrated road asset management = Elektronski vir
    Lenart, Stanislav ...
    Bridges and tunnels are exposed to various types of deterioration processes and thus they are subject of monitoring. Data are usually generated during the whole life cycle of assets. Thus it is ... important to collect as much as possible information today in order to reliably predict their performance in future. While monitoring is in charge of information and data collection, additionally data management is as important as their generation. It is crucial for the reliable infrastructure asset to be aware of infrastructure existing physical conditions at every point in the life cycle and therefore to capture and analyse monitoring data from the post-construction model and information from real-time monitoring. Paper presents the concept of handling with monitored data by the use of Building Information Modeling (BIM) concept.
    Type of material - conference contribution ; adult, serious
    Publish date - 2019
    Language - english
    COBISS.SI-ID - 142178563