-
Supply-chain transparency within industrialized construction projectsČuš Babič, Nenad ...This paper addresses those issues relating to the integration of information flows in relation to material management throughout the construction industry supply-chain. Based on a case study, it ... shows how to bridge any gaps between those information systems used within the design, prefabrication, and on-site construction processes. The information requirements of the aforementioned three key processes are analysed regarding an industrialized construction project, and any gaps identified between their three sets of requirements. A theoretical model for information mapping is proposed using these requirements. The solution is then verified through a case study, performed within the operational environment of a construction company. This case study represents one approach for applying the proposed information mapping model, and possible benefits for the industry. The information analysis highlights significant distinctions among particular views on the information required for supporting the tasks during the three above-mentioned processes. The main difference lies in the levels of data granularity important for particular tasks. Building Information Modelling based construction (BIM-based construction) proved itself to be an adequate context for bridging the information gaps. BIM-based construction can accommodate the proposed model for information mapping across the processes. Within this context it is possible to separate the identities of physical building elements from those of designed building elements, which is required when mapping. This study shows that it is feasible to automate the proposed information mapping in the form of a computer algorithm. It explains the value and necessity of building information model (BIM) usage, in order to provide the context for information mapping. The integration of design, manufacturing, and construction processes, and a transparency of information about material resources across these processes, would bring significant benefits for all stakeholders within the supply-chain. In the case study, the architecture and a prototype of the software system were developed in order to implement the proposed idea. Specifically, the case study showed that the proposed information mapping improved the projectʼs progress monitoring, detailed planning, and management of material flows, across the construction supply-chain.Vir: Computers in industry. - ISSN 0166-3615 (iss. 2, Vol. 65, Feb. 2014, str. 345-353)Vrsta gradiva - članek, sestavni delLeto - 2014Jezik - angleškiCOBISS.SI-ID - 17426198
Avtor
Čuš Babič, Nenad |
Rebolj, Danijel |
Nekrep, Matjaž P. |
Podbreznik, Peter
Teme
gradbeništvo |
dobaviteljske verige |
upravljanje dobaviteljskih verig |
upravljanje z materialom |
interoperabilnost |
projektni menedžment |
gradbena informatika |
informacijsko modeliranje zgradb |
construction industry |
building an information-model |
interoperability |
supply-chain management |
material management |
project management |
building information modeling |
BIM
![loading ... loading ...](themes/default/img/ajax-loading.gif)
Vnos na polico
Trajna povezava
- URL:
Faktor vpliva
Dostop do baze podatkov JCR je dovoljen samo uporabnikom iz Slovenije. Vaš trenutni IP-naslov ni na seznamu dovoljenih za dostop, zato je potrebna avtentikacija z ustreznim računom AAI.
Leto | Faktor vpliva | Izdaja | Kategorija | Razvrstitev | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Baze podatkov, v katerih je revija indeksirana
Ime baze podatkov | Področje | Leto |
---|
Povezave do osebnih bibliografij avtorjev | Povezave do podatkov o raziskovalcih v sistemu SICRIS |
---|---|
Čuš Babič, Nenad | 16431 |
Rebolj, Danijel | 05528 |
Nekrep, Matjaž P. | 10947 |
Podbreznik, Peter | 26194 |
Izberite prevzemno mesto:
Prevzem gradiva po pošti
Obvestilo
Gesla v Splošnem geslovniku COBISS
Izbira mesta prevzema
Mesto prevzema | Status gradiva | Rezervacija |
---|
Prosimo, počakajte trenutek.