-
Implementing building performance modelling through BIM methodology and its implication on building design process : master thesis No.: 208/II. GR-BIM = Vpliv uporabe zmogljivostnega načrtovanja v povezavi z BIM metodologijo na postopek načrtovanja stavb : [magistrsko delo]Moskvina, EkaterinaConstruction 4.0 requires new approaches and methods to achieve primary goalsset for the industry, such as sustainable cities and communities, responsible consumption and production, climate actions, ... innovations. Although the performance-based design (PBD) approach is not new, it is innovative in how it faces these goals compared to the traditional approach. The study discusses the concept of performance-based design in general. It reviews the methods and tools that can support the PBD application in the early design stage, such as Integrated Design Process, Building Information Modelling and others. This master thesis aims to clarify major differences between the conventional and the PBD approach when applied in the initial design stage. It identifies the benefits of the new approach and the limitations and difficulties when applied in practice. It identified issues of using PBD in practice throughout a survey of 43 respondents from 21 countries. Finally, it examines the ability and readiness of the PBD method to substitute the traditional design approach. It compares the two approaches with a practical hypothetical project of an office building in Mengeš, Slovenia. The case study results are the workflow and a strategy proposed to apply the PBD approach in the early design stage. The strategy can be used regardless of the modelling and analysis tools and for the residential, commercial and public projects. It helps to explore vast design space relatively quickly to understand design trends and options with the greatest impact on future building performance.Type of material - master's thesis ; adult, seriousPublication and manufacture - Ljubljana : [E. Moskvina], 2021Language - englishCOBISS.SI-ID - 81316099
Author
Moskvina, Ekaterina
Other authors
Košir, Mitja, arhitektura in gradbeništvo, 1977-
Topics
civil engineering |
master thesis |
BIM |
performance-based design |
early design stage |
design process |
gradbeništvo |
magistrska dela |
GR |
BIM |
zmogljivostno načrtovanje |
zgodnja faza načrtovanja stavb |
načrtovalski proces
Library/institution |
City | Acronym | For loan | Other holdings |
---|---|---|---|---|
Faculty of Civil and Geodetic Engineering, Ljubljana | Ljubljana | FGGLJ |
reading room 1 cop.
|
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|---|
Moskvina, Ekaterina | |
Košir, Mitja, arhitektura in gradbeništvo, 1977- | 25479 |
Select pickup location:
Material pickup by post
Notification
Subject headings in COBISS General List of Subject Headings
Select pickup location
Pickup location | Material status | Reservation |
---|
Please wait a moment.