DIKUL - logo

Search results

Basic search    Expert search   

Currently you are NOT authorised to access e-resources UL. For full access, REGISTER.

1
hits: 4
1.
  • Scheduling of bus maintenan... Scheduling of bus maintenance by the P-graph methodology
    Adonyi, Róbert; Heckl, István; Olti, Ferenc Optimization and engineering, 11/2013, Volume: 14, Issue: 4
    Journal Article
    Peer reviewed

    The P-graph (process graph) framework is applied herein for the bus maintenance planning in the public transport system. Public transportation is an essential part of the life of each major city. A ...
Full text
Available for: UL
2.
  • Effective scheduling of a l... Effective scheduling of a large-scale paint production system
    Adonyi, Róbert; Biros, Gábor; Holczinger, Tibor ... Journal of cleaner production, 2008, 2008-1-00, 20080101, Volume: 16, Issue: 2
    Journal Article
    Peer reviewed

    Due to the large variety of options offered to customers, batch production schemes are highly accepted in the paint industry implying that scheduling plays an important role in optimal allocation of ...
Full text
Available for: UL
3.
Full text
Available for: UL
4.
  • Genome characterization of ... Genome characterization of a novel megrivirus-related avian picornavirus from a carnivorous wild bird, western marsh harrier (Circus aeruginosus)
    Boros, Ákos; Pankovics, Péter; Mátics, Róbert ... Archives of virology, 09/2017, Volume: 162, Issue: 9
    Journal Article
    Peer reviewed
    Open access

    In this study, the complete genome of a novel picornavirus called harrier picornavirus 1 (HaPV-1) strain harrier/MR-01/HUN/2014 (KY488458) was sequenced and analysed from a cloacal sample of a ...
Full text
Available for: UL

PDF

Load filters