DIKUL - logo
France Bevk Public Library, Nova Gorica - all departments (SIKNG)
  • Imej me rajši od vsega na s... (cover)
    Imej me rajši od vsega na svetu : zgodbe o pripadanju
    Furlan, Mira, 1955-2021
    Type of material - book ; adult, serious
    Edition - 1. izd.
    Publication and manufacture - Ljubljana : Mladinska knjiga, 2023
    Language - slovenian
    ISBN - 978-961-01-6903-1
    COBISS.SI-ID - 150024707

    Link(s):

    DobreKnjige

Digital content: dCOBISS

preview

jpeg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Centralna knjižnica
on loan - outside loan, due date: 31.07.2024
Expected to be available after: 01.02.2025 (16. in queue)
Centralna - paketnik
on loan - outside loan, due date: 31.07.2024
Expected to be available after: 01.02.2025 (16. in queue)
Potujoča knjižnica
in mobile library 1: on loan - outside loan, due date: 12.09.2024
Expected to be available after: 08.06.2026 (7. in queue)
Solkan
on loan - outside loan, due date: 26.07.2024
Expected to be available after: 20.09.2024 (3. in queue)
Šempeter
on loan - outside loan, due date: 08.08.2024
Expected to be available after: 02.09.2024 (2. in queue)
Call number – location, accession no. ... Copy status
Centralna knjižnica 0000000929 FURLAN M. Imej Centralna knjižnica 929 FURLAN M. Imej on loan - outside loan, due date: 31.07.2024

Expected to be available after: 01.02.2025 (16. in queue)
Centralna knjižnica 0000000929 FURLAN M. Imej Centralna knjižnica 929 FURLAN M. Imej on loan - outside loan, due date: 18.07.2024

Expected to be available after: 01.02.2025 (16. in queue)
Potujoča knjižnica 0000000929 FURLAN M. Imej Potujoča knjižnica 929 FURLAN M. Imej in mobile library 1: on loan - outside loan, due date: 12.09.2024

Expected to be available after: 08.06.2026 (7. in queue)
Solkan 0000000929 FURLAN M. Imej Solkan 929 FURLAN M. Imej on loan - outside loan, due date: 26.07.2024

Expected to be available after: 20.09.2024 (3. in queue)
Šempeter 0000000929 FURLAN M. Imej Šempeter 929 FURLAN M. Imej on loan - outside loan, due date: 08.08.2024

Expected to be available after: 02.09.2024 (2. in queue)
loading ...
loading ...
loading ...