DIKUL - logo
Public Library Miran Jarc Novo mesto - all departments (SIKNM)
  • Nočna mora; Paganinikontraktet (cover)
    Nočna mora
    Kepler, Lars
    Type of material - novel ; adult, general
    Edition - 1. izd.
    Publication and manufacture - Ljubljana : Hiša knjig, HKZ, 2024
    Language - slovenian
    ISBN - 978-961-7214-30-7; 978-961-7214-31-4
    COBISS.SI-ID - 174597123

Digital content: dCOBISS

preview

jpg


Call number – location, accession no. ... Copy status Reservation
DVOR
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402083
DVOR
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402083
available - outside loan, loan period: 21 days
STRAŽA
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402082
STRAŽA
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402082
available - outside loan, loan period: 21 days
POTUJOČA KNJIŽNICA
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402079
POTUJOČA KNJIŽNICA
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402079
in mobile library 1: on loan - outside loan, due date: 24.09.2024

Expected to be available after: 25.09.2024 (1. in queue)
DOL. TOPLICE
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402084
DOL. TOPLICE
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402084
on loan - outside loan, due date: 23.09.2024

Expected to be available after: 24.09.2024 (1. in queue)
ODDELEK ZA ODRASLE
KEPLER L. Nočna 2.knj
IN: 202402085
ODDELEK ZA ODRASLE
KEPLER L. Nočna 2.knj
IN: 202402085
on loan - outside loan, due date: 02.10.2024

Expected to be available after: 26.09.2024 (1. in queue)
ODDELEK ZA ODRASLE
KEPLER L. Nočna 2.knj
IN: 202402086
ODDELEK ZA ODRASLE
KEPLER L. Nočna 2.knj
IN: 202402086
on loan - outside loan, due date: 25.09.2024

Expected to be available after: 26.09.2024 (1. in queue)
ŠKOCJAN
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402081
ŠKOCJAN
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402081
on loan - outside loan, due date: 02.10.2024

Expected to be available after: 03.10.2024 (1. in queue)
ŠENTJERNEJ
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402080
ŠENTJERNEJ
821-312.4 KEPLER L. Nočna 2.knj
IN: 202402080
on loan - outside loan, due date: 19.09.2024

Expected to be available after: 11.10.2024 (2. in queue)
loading ...
loading ...
loading ...