-
BIM project progression auditing system: use-case methods & Revit plug-in prototype : master thesis No.: 233/II. GR-BIM = Sistem za nadzor napredovanja projektov BIM: primeri uporabe metod in prototip Revit vtičnika : [magistrsko delo]Ikede, Akpezi VictoriaProjects in the construction industry require input from different stakeholders to create a building information model. This model is a data repository and basis for decision making throughout the ... project’s lifecycle. The final model is typically an aggregate of input from multiple stakeholders and as the project progresses across phases, the model complexity also increases. This is due to the need to take into account more factors as the project becomes more complex. The benefits that stakeholders can receive from automated data collection systems and tools can help in analysing the efficiency and effectiveness of a process, as well as verifying the accuracy and completeness of a model against established requirements. A system which facilitates this kind of project auditing, along with actors, use cases, and requirements is helpful in order to maintain a cohesive project. A prototype of a selected use case: tracking project iterations was developed and demonstrated as a proof of concept for the proposed system. Autodesk Revit is a popular Information modelling tool that allows users to extend its functionality through its open API. The prototype was created in Revit API and C# programming languages and will be installed as a plugin to extend the Revit default function. The results from the prototype were analysed and discussed in a Business Intelligence dashboard.Vrsta gradiva - magistrsko delo ; neleposlovje za odrasleZaložništvo in izdelava - Ljubljana : [A. V. Ikede], 2022Jezik - angleškiCOBISS.SI-ID - 125927171
Avtor
Ikede, Akpezi Victoria
Drugi avtorji
Cerovšek, Tomo |
Kogovšek, Andrej
Teme
civil engineering |
master thesis |
BIM |
progress monitoring |
project auditing |
system design |
use cases |
track changes |
gradbeništvo |
magistrska dela |
GR |
BIM |
spremljanje projekta |
načrtovanje sistemov |
primeri uporabe |
spremljanje sprememb
Signatura – lokacija, inventarna št. ... |
Status izvoda | Rezervacija |
---|---|---|
Centralna knjižnica na Jamovi Č 043.3 IKEDE AKPEZI V. BIM project IN: 420220050 Centralna knjižnica na Jamovi Č 043.3 IKEDE AKPEZI V. BIM project IN: 420220050 |
prosto - za čitalnico
|
Vnos na polico
Trajna povezava
- URL:
Faktor vpliva
Dostop do baze podatkov JCR je dovoljen samo uporabnikom iz Slovenije. Vaš trenutni IP-naslov ni na seznamu dovoljenih za dostop, zato je potrebna avtentikacija z ustreznim računom AAI.
Leto | Faktor vpliva | Izdaja | Kategorija | Razvrstitev | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Baze podatkov, v katerih je revija indeksirana
Ime baze podatkov | Področje | Leto |
---|
Povezave do osebnih bibliografij avtorjev | Povezave do podatkov o raziskovalcih v sistemu SICRIS |
---|---|
Ikede, Akpezi Victoria | |
Cerovšek, Tomo | 18683 |
Kogovšek, Andrej | 26041 |
Izberite prevzemno mesto:
Prevzem gradiva po pošti
Obvestilo
Gesla v Splošnem geslovniku COBISS
Izbira mesta prevzema
Mesto prevzema | Status gradiva | Rezervacija |
---|
Prosimo, počakajte trenutek.