The layer 0 inner silicon detector of the D0 experiment Angstadt, R.; Bagby, L.; Bean, A. ...
Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment,
10/2010, Letnik:
622, Številka:
1
Journal Article
Recenzirano
This paper describes the design, fabrication, installation and performance of the new inner layer called Layer 0 (L0) that was inserted in the existing Run IIa silicon micro-strip tracker (SMT) of ...the D0 experiment at the Fermilab Tevatron p¯p collider. L0 provides tracking information from two layers of sensors, which are mounted with center lines at a radial distance of 16.1 and 17.6mm from the beam axis. The sensors and read-out electronics are mounted on a specially designed and fabricated carbon fiber structure that includes cooling for sensor and read-out electronics. The structure has a thin polyimide circuit bonded to it so that the circuit couples electrically to the carbon fiber allowing the support structure to be used both for detector grounding and a low impedance connection between the remotely mounted hybrids and the sensors.
The upgraded DØ detector Abazov, V.M.; Alves, G.A.; Askew, A. ...
Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment,
2006, Letnik:
565, Številka:
2
Journal Article
Recenzirano
Odprti dostop
The DØ experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements ...to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to DØ.
The 3rd harmonic 3.9 GHz accelerating cavity was proposed to improve beam performances for TTF-FEL facility. In the frame of collaboration Fermilab will provide DESY with a cryomodule containing a ...string of four cavities. In addition, a second cryomodule with one cavity will be fabricated for installation in the Fermilab photo-injector, which will be upgraded for the International Linear Collider (ILC) accelerator test facility. In this paper we will discuss the status of the cavity and coupler production and the first result of cavity tests. It is hoped that this project will be completed during the first half of 2007 and the cryomodule delivered to DESY in this time span.
The D0 Silicon Microstrip Tracker Ahmed, S.N.; Aoki, M.; Åsman, B. ...
Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment,
04/2011, Letnik:
634, Številka:
1
Journal Article
Recenzirano
Odprti dostop
This paper describes the mechanical design, the readout chain, the production, testing and the installation of the Silicon Microstrip Tracker of the D0 experiment at the Fermilab Tevatron collider. ...In addition, we describe the performance and operational experience of the detector during the experiment data collection between 2001 and 2010.
The FLASH user facility providing free electron laser radiation is built based on the TTF project at DESY. Fermilab has the responsibility for the design and processing of a third harmonic, 3.9 GHz, ...superconducting cavity which is powered via a coaxial power coupler. Six power couplers have been manufactured at CPI after successful design of the power coupler including RF simulation, multipacting calculation, and thermal analysis. The power couplers are being tested and processed with high pulsed power in an elaborate test stand at Fermilab now. This paper presents the RF design and processing work of the power coupler.
Fermilab is involved in an effort to assemble 3.9 GHz superconducting RF cavities into a four cavity cryomodule for use at the DESY TTF/FLASH facility as a third harmonic structure. The design ...gradient of the cavities is 14 MV/m. This effort involves design, fabrication, intermediate testing, assembly, and eventual delivery of the cryomodule. We report on all facets of this enterprise from design through future plans. Included will be test results of single 9-cell cavities, lessons learned, and current status.
This paper describes the design, fabrication, installation and performance of the new inner layer called Layer 0 (L0) that was inserted in the existing Run IIa Silicon Micro-Strip Tracker (SMT) of ...the D0 experiment at the Fermilab Tevatron collider. L0 provides tracking information from two layers of sensors, which are mounted with center lines at a radial distance of 16.1 mm and 17.6 mm respectively from the beam axis. The sensors and readout electronics are mounted on a specially designed and fabricated carbon fiber structure that includes cooling for sensor and readout electronics. The structure has a thin polyimide circuit bonded to it so that the circuit couples electrically to the carbon fiber allowing the support structure to be used both for detector grounding and a low impedance connection between the remotely mounted hybrids and the sensors.
This paper describes the mechanical design, the readout chain, the production, testing and the installation of the Silicon Microstrip Tracker of the D0 experiment at the Fermilab Tevatron collider. ...In addition, description of the performance of the detector during the experiment data collection between 2001 and 2010 is provided.