  • Cost overruns of public sec... Cost overruns of public sector construction projects: a developing country perspective
    Asiedu, Richard Ohene; Adaku, Ebenezer International journal of managing projects in business, 01/2020, Volume: 13, Issue: 1
    Journal Article
    Peer reviewed
    Open access

    Purpose Cost overrun of construction projects has been a key concern for all stakeholders of projects for many decades now. Many studies have been done in the past and continue to be done currently ...
Full text

PDF
2.
  • Assessing the predictabilit... Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo
    Richard Ohene Asiedu; Gyadu-Asiedu, William Journal of engineering, design and technology, 04/2020, Volume: 18, Issue: 3
    Journal Article
    Peer reviewed

    PurposeThis paper aims to focus on developing a baseline model for time overrun.Design/methodology/approachInformation on 321 completed construction projects used to assess the predictive performance ...
Full text
3.
  • Contribution of procurement... Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement
    Manu, Patrick; Asiedu, Richard Ohene; Mahamadu, Abdul-Majeed ... Engineering, construction, and architectural management, 11/2021, Volume: 28, Issue: 10
    Journal Article
    Peer reviewed
    Open access

    PurposeEffective procurement of infrastructure is linked to the attainment of the sustainable development goals set by the United Nations. While the capacity of organisations is generally thought to ...
Full text

PDF
4.
  • Using lateritic gravel as a... Using lateritic gravel as all-in aggregate for concrete production
    Richard Ohene Asiedu Journal of engineering, design and technology, 06/2017, Volume: 15, Issue: 3
    Journal Article
    Peer reviewed

    PurposeThe quest to reduce the cost of concrete which is a major construction input has prompted investigations into assessing the suitability of alternative sources of conventional materials. This ...
Full text
5.
  • Critical skills for infrast... Critical skills for infrastructure procurement: insights from developing country contexts
    Richard Ohene Asiedu; Manu, Patrick; Abdul-Majeed Mahamadu ... Journal of engineering, design and technology, 11/2023, Volume: 21, Issue: 6
    Journal Article
    Peer reviewed
    Open access

    PurposeEffective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role. Addressing the ...
Full text

PDF
6.
  • Predicting likelihood of co... Predicting likelihood of cost overrun in educational projects
    Asiedu, Richard Ohene; Frempong, Nana Kena; Alfen, Hans Wilhelm Engineering, construction, and architectural management, 01/2017, Volume: 24, Issue: 1
    Journal Article
    Peer reviewed

    Purpose Being able to predict the likelihood of a project to overrun its cost before the contract signing phase is crucial in developing the required mitigating measures to avert it. Known parameters ...
Full text
7.
  • Analysis of latent impeding... Analysis of latent impeding factors to solar photovoltaic investments in Ghana
    Sackey, David Mensah; Owusu-Manu, De-Graft; Asiedu, Richard Ohene ... International journal of energy sector management, 05/2020, Volume: 14, Issue: 4
    Journal Article
    Peer reviewed

    Purpose Ghana has recently reviewed its renewable energy Act 835 with an objective of providing 10% of its energy from renewables by 2020 (Ackah and Asomani, 2015). Meanwhile, solar Photovoltaic (PV) ...
Full text
8.
  • Insurable and non-insurable... Insurable and non-insurable risks in complex project deals: case of the Ghanaian construction industry
    De-Graft, Owusu-Manu; Ghansah, Frank Ato; Amos Darko ... Journal of engineering, design and technology, 10/2020, Volume: 18, Issue: 6
    Journal Article
    Peer reviewed
    Open access

    PurposeThe purpose of this study is to investigate the insurable risks that impacted the operations on complex construction projects in developing countries using Ghana as a case ...
Full text

PDF
9.
  • An assessment of mortgage l... An assessment of mortgage loan default propensity in Ghana
    De-Graft, Owusu-Manu; Richard Ohene Asiedu; Edwards, David John ... Journal of engineering, design and technology, 09/2019, Volume: 17, Issue: 5
    Journal Article
    Peer reviewed
    Open access

    PurposeCredit market development requires appropriate credit assessment and default policies. This paper aims to examine the impact of household characteristics on mortgage default, using survey data ...
Full text

PDF
10.
  • Determinants of mortgage pr... Determinants of mortgage price affordability: a study of Ghana
    Owusu-Manu, DeGraft; Edwards, David John; Pärn, Erika Anneli ... International journal of housing markets and analysis, 07/2018, Volume: 11, Issue: 4
    Journal Article
    Peer reviewed
    Open access

    Purpose While mortgage markets have gradually emerged in many African countries, substantial barriers still hinder their growth and expansion. Affordability has been widely cited as a prominent issue ...