UNI-MB - logo
UMNIK - logo
 

Search results

Basic search    Expert search   

Currently you are NOT authorised to access e-resources UM. For full access, REGISTER.

1
hits: 3
1.
  • Effective Use of Tower Cran... Effective Use of Tower Cranes over Time in the Selected Construction Process
    Motyčka, Vít; Gašparík, Jozef; Přibyl, Oto ... Buildings, 04/2022, Volume: 12, Issue: 4
    Journal Article
    Peer reviewed
    Open access

    The quality of preparations carried out before building work commences has a significant impact on the smooth running and overall financial costs of a construction project. The use of construction ...
Full text
2.
  • Advantages and Disadvantage... Advantages and Disadvantages of Modular Construction, including Environmental Impacts
    Hořínková, Dita IOP conference series. Materials Science and Engineering, 11/2021, Volume: 1203, Issue: 3
    Journal Article
    Peer reviewed
    Open access

    Abstract Similar to other fields, the construction industry tends to constantly evolve. There is an increasing demand for the construction of new buildings regarding the speed of the construction ...
Full text

PDF
3.
  • Analysis of construction su... Analysis of construction sub-processes for the evaluation of the real performance of tower cranes
    Doubek, Rostislav; Hořínková, Dita; Štěrba, Martin ... IOP conference series. Materials Science and Engineering, 11/2021, Volume: 1203, Issue: 2
    Journal Article
    Peer reviewed
    Open access

    Abstract The productivity of work performed at construction sites is primarily dependent on the effective deployment and use of construction machinery. Nevertheless, manufacturers do not state the ...
Full text

PDF

Load filters