UNI-MB - logo
UMNIK - logo
 

Search results

Basic search    Expert search   

Currently you are NOT authorised to access e-resources UM. For full access, REGISTER.

1 2 3 4 5
hits: 114
1.
  • Exploring performance of th... Exploring performance of the integrated project delivery process on complex building projects
    Mesa, Harrison A.; Molenaar, Keith R.; Alarcón, Luis F. International journal of project management, 10/2016, Volume: 34, Issue: 7
    Journal Article
    Peer reviewed

    Many building projects do not meet owners' performance expectations. Integrated project delivery (IPD) has emerged as a new delivery system with the potential to provide better performance through ...
Full text
2.
  • Impact of Risk on Design-Bu... Impact of Risk on Design-Build Selection for Highway Design and Construction Projects
    Tran, Dai Q; Molenaar, Keith R Journal of management in engineering, 03/2014, Volume: 30, Issue: 2
    Journal Article
    Peer reviewed

    AbstractThe design-build (DB) project delivery method continues to grow as a viable alternative delivery method for highway projects. The primary reason for selecting DB delivery is to take advantage ...
Full text
3.
Full text

PDF
4.
  • Construction Project Cost E... Construction Project Cost Escalation Factors
    Shane, Jennifer S; Molenaar, Keith R; Anderson, Stuart ... Journal of management in engineering, 10/2009, Volume: 25, Issue: 4
    Journal Article
    Peer reviewed

    Construction projects, private and public alike, have a long history of cost escalation. Transportation projects, which typically have long lead times between planning and construction, are ...
Full text
5.
Full text
6.
  • Programmatic Cost Risk Anal... Programmatic Cost Risk Analysis for Highway Megaprojects
    Molenaar, Keith R Journal of construction engineering and management, 03/2005, Volume: 131, Issue: 3
    Journal Article
    Peer reviewed

    Highway megaprojects (construction projects over $100 million) are fraught with uncertainty. These projects have historically experienced increases in project costs from the time that a project is ...
Full text
7.
  • Framework for Measuring Cor... Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance
    Molenaar, Keith R; Park, Jeong-Il; Washington, Simon Journal of construction engineering and management, 06/2009, Volume: 135, Issue: 6
    Journal Article
    Peer reviewed

    This paper presents the results of a structural equation model (SEM) that describes and quantifies the relationships between corporate culture and safety performance. The SEM is estimated using 196 ...
Full text
8.
Full text

PDF
9.
  • MANAGEMENT OF TIME AND COST... MANAGEMENT OF TIME AND COST CONTINGENCIES IN CONSTRUCTION PROJECTS: A CONTRACTOR PERSPECTIVE
    Ortiz, José I.; Pellicer, Eugenio; Molenaar, Keith R. Journal of civil engineering and management, 05/2018, Volume: 24, Issue: 3
    Journal Article
    Peer reviewed
    Open access

    The management of threats and opportunities plays a key-role in enhancing project performance. However, there is a gap in literature concerning how general contractors manage threats and ...
Full text

PDF
10.
  • Selection of Project Delive... Selection of Project Delivery Method in Transit: Drivers and Objectives
    Touran, Ali; Gransberg, Douglas D; Molenaar, Keith R ... Journal of management in engineering, 01/2011, Volume: 27, Issue: 1
    Journal Article
    Peer reviewed

    This paper describes the results of research on alternative project delivery methods in transit projects in the United States. The research, sponsored by the Transit Cooperative Research Program, ...
Full text
1 2 3 4 5
hits: 114

Load filters