UNI-MB - logo
UMNIK - logo
 
Public Library Ivan Tavčar Škofja Loka - all departments (SIKSKL)
  • Kako sta Bibi in Gusti zali... (cover)
    Kako sta Bibi in Gusti zalivala hišico
    Mlakar, Ida
    Type of material - picture book ; primary, ages 5-10
    Edition - 1. izd.
    Publication and manufacture - Radovljica : Didakta, 2018
    Language - slovenian
    ISBN - 978-961-261-508-6
    COBISS.SI-ID - 297949696

Digital content: dCOBISS

preview

jpg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Gorenja Vas
available - outside loan, loan period: 21 days
Gorenja Vas, paketnik
Parcel box
available - outside loan, loan period: 21 days
Poljane
available - outside loan, loan period: 21 days
Trata
available - outside loan, loan period: 21 days
Škofja Loka
on loan - outside loan, due date: 06.09.2024
Expected to be available after: 07.09.2024 (1. in queue)
Škofja Loka, paketnik
on loan - outside loan, due date: 06.09.2024
Expected to be available after: 07.09.2024 (1. in queue)
Železniki
on loan - outside loan, due date: 12.09.2024
Expected to be available after: 13.09.2024 (1. in queue)
Železniki, paketnik
on loan - outside loan, due date: 12.09.2024
Expected to be available after: 13.09.2024 (1. in queue)
Žiri
on loan - outside loan, due date: 17.09.2024
Expected to be available after: 18.09.2024 (1. in queue)
Žiri, paketnik
on loan - outside loan, due date: 17.09.2024
Expected to be available after: 18.09.2024 (1. in queue)
Call number – location, accession no. ... Copy status
Gorenja vas
m C MLAKAR I. Kako
IN: 400097048
Gorenja vas
m C MLAKAR I. Kako
IN: 400097048
available - outside loan, loan period: 21 days
Poljane
m C MLAKAR I. Kako
IN: 400097049
Poljane
m C MLAKAR I. Kako
IN: 400097049
available - outside loan, loan period: 21 days
Trata
m C MLAKAR I. Kako
IN: 400097050
Trata
m C MLAKAR I. Kako
IN: 400097050
available - outside loan, loan period: 21 days
Škofja Loka
m C MLAKAR I. Kako
IN: 400097046
Škofja Loka
m C MLAKAR I. Kako
IN: 400097046
on loan - outside loan, due date: 06.09.2024

Expected to be available after: 07.09.2024 (1. in queue)
Škofja Loka
m C MLAKAR I. Kako
IN: 400097047
Škofja Loka
m C MLAKAR I. Kako
IN: 400097047
on loan - outside loan, due date: 17.09.2024

Expected to be available after: 07.09.2024 (1. in queue)
Železniki
m C MLAKAR I. Kako
IN: 400097051
Železniki
m C MLAKAR I. Kako
IN: 400097051
on loan - outside loan, due date: 12.09.2024

Expected to be available after: 13.09.2024 (1. in queue)
Žiri
m C MLAKAR I. Kako
IN: 400097052
Žiri
m C MLAKAR I. Kako
IN: 400097052
on loan - outside loan, due date: 17.09.2024

Expected to be available after: 18.09.2024 (1. in queue)
loading ...
loading ...
loading ...