UNI-MB - logo
UMNIK - logo
 
Public Library Ivan Tavčar Škofja Loka - all departments (SIKSKL)
  • Čebeljčnjaček (cover)
    Čebeljčnjaček
    Vinder, Urška
    Citiram njeno mnenje o vsebini knjige: «Zgodba o prav posebnem čebeljčnjačku Filipu s svojo hudomušnostjo in igrivostjo spodbuja predšolske otroke k razvoju številnih področij govorno-jezikovnega ... razvoja. S priporočili opolnomoči starše in vzgojitelje za številne zabavne aktivnosti, ki obogatijo in razširijo vsebino zgodbe ter obenem usmerjajo otroke k razvoju slušne pozornosti in fonološkega zavedanja«. Source: dCOBISS
    Type of material - picture book ; primary, ages 5-10
    Publication and manufacture - Maribor : Skrivnost, 2020
    Language - slovenian
    ISBN - 978-961-7048-22-3
    COBISS.SI-ID - 301970944

Digital content: dCOBISS

preview

jpg

preview

jpeg


Reserve material at the desired pickup location.

Pickup location Material status Reservation
Škofja Loka
available - outside loan, loan period: 21 days
Škofja Loka, paketnik
Parcel box
available - outside loan, loan period: 21 days
Železniki
available - outside loan, loan period: 21 days
Železniki, paketnik
Parcel box
available - outside loan, loan period: 21 days
Žiri
available - outside loan, loan period: 21 days
Žiri, paketnik
Parcel box
available - outside loan, loan period: 21 days
Trata
on loan - outside loan, due date: 03.10.2025
Expected to be available after: 06.10.2025 (1. in queue)
Call number – location, accession no. ... Copy status
Škofja Loka
m C VINDER U. Čebeljčnjaček
IN: 400102930
Škofja Loka
m C VINDER U. Čebeljčnjaček
IN: 400102930
available - outside loan, loan period: 21 days
Železniki
m C VINDER U. Čebeljčnjaček
IN: 400102933
Železniki
m C VINDER U. Čebeljčnjaček
IN: 400102933
available - outside loan, loan period: 21 days
Žiri
m C VINDER U. Čebeljčnjaček
IN: 400102934
Žiri
m C VINDER U. Čebeljčnjaček
IN: 400102934
available - outside loan, loan period: 21 days
Trata
m C VINDER U. Čebeljčnjaček
IN: 400102932
Trata
m C VINDER U. Čebeljčnjaček
IN: 400102932
on loan - outside loan, due date: 03.10.2025

Expected to be available after: 06.10.2025 (1. in queue)
loading ...
loading ...
loading ...