Brandić, Vanda; Kolić, Ddamir
Pomorski zbornik, 04/2018, Volume: 2, Issue: Special edition 2Journal Article, Paper
The product work breakdown structure (PWBS) of a shipyard defines both the interim product breakdown and the work breakdown. Shipyards that have a well defined PWBS can effectively reduce man-hours by applying techniques of group technology and hull block construction method (HBCM). In this paper, a case study of typical double-bottom blocks of both a car carrier and a self-unloading bulker vessel designed in different shipyards, are analyzed. Since each shipyard applies a different interim product breakdown structure (PBS), a best practice tabular comparision demonstrates which PBS is better. The conclusion is that different shipyards under the same corporation should objectively apply best practice methods which recognize and apply what is best from one yard to the other yard and vice-versa. This will raise the competitiveness level of both shipyards.
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
If the library membership card is not in the list,
add a new one.
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|
Source: Personal bibliographies
and: SICRIS
The material is available in full text. If you wish to order the material anyway, click the Continue button.