UNI-MB - logo
UMNIK - logo
 
E-resources
Full text
Peer reviewed
  • An analysis of EDF schedula...
    Baker, T.P.

    IEEE transactions on parallel and distributed systems, 08/2005, Volume: 16, Issue: 8
    Journal Article

    A new schedulability test is derived for preemptive deadline scheduling of periodic or sporadic real-time tasks on a single-queue m-server system. The new test allows the task deadline to be more or less than the task period, and is based on a new analysis concept, called a /spl mu/-busy interval. This generalizes a result of Goossens et al. 2003 that a system of periodic tasks with maximum individual task utilization u/sub max/ is EDF-schedulable on m processors if the total utilization does not exceed m(1 /sup max/)+u/sub max/. The new test allows the analysis of hybrid EDF-US x scheduling, and the conclusion that EDF-US1/2 is optimal, with a guaranteed worst-case schedulable utilization of (m +1)/2.