E-resources
-
Cao, Yuan; Ma, Lianchuan; Xiao, Shuo; Zhang, Xia; Xu, Wei
Chinese Journal of Electronics, September 2017, Volume: 26, Issue: 5Journal Article
According to the standard for the GSM for railway(GSM-R) wireless systems in China train control system level 3(CTCS-3),the control data transfer delay should be no larger than 500 ms with greater than99% probability.Coverage of both non-redundant networks and intercross redundant networks and cases of single Mobile terminals(MTs) and redundant MTs on one train are considered,and the corresponding vehicle-ground communication models,delay models,and fault models are constructed.The simulation results confirm that the transfer delay can meet the standard requirements under all cases.In particular,the probability is greater than 99.996% for redundant MTs and networks,and the standard of transfer delay in CTCS-3 will be improved inevitably.
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
If the library membership card is not in the list,
add a new one.
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|
Source: Personal bibliographies
and: SICRIS
The material is available in full text. If you wish to order the material anyway, click the Continue button.