E-resources
-
El-Belasy, Ahmed M.; Nada, Ahmed M.; Diweder, Al Sayed I.
Ain Shams Engineering Journal, 06/2013, Volume: 4, Issue: 2Journal Article
El-Salam Pump Stations (1) and (2) are located at 22.1km and 54.3km respectively at El-Salam Canal. When El-Salam Pump Station (1) is in operation, and switching off El-Salam Pump Station (2), water level rises upstream El-Salam Pump Station (2). Water level overtops El-Salam Pump Station (2) and banks upstream it. Flooding then takes place as Wadi El Noqra Canal, Egypt. This necessitates discharging the excess water to protect the pump station and the canal from water flooding when the electricity is shut down. The hydrodynamic simulation of El-Salam Canal determinates the critical time for storage capacity according to location and type of emergency spillways through the numerical model to prevent water overtopping upstream pump stations. Determination of the critical time of storage capacity is considered as a new parameter in case of the hydraulic design of the canal controlled by cross pump stations.
![loading ... loading ...](themes/default/img/ajax-loading.gif)
Shelf entry
Permalink
- URL:
Impact factor
Access to the JCR database is permitted only to users from Slovenia. Your current IP address is not on the list of IP addresses with access permission, and authentication with the relevant AAI accout is required.
Year | Impact factor | Edition | Category | Classification | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Select the library membership card:
If the library membership card is not in the list,
add a new one.
DRS, in which the journal is indexed
Database name | Field | Year |
---|
Links to authors' personal bibliographies | Links to information on researchers in the SICRIS system |
---|
Source: Personal bibliographies
and: SICRIS
The material is available in full text. If you wish to order the material anyway, click the Continue button.