UNI-MB - logo
UMNIK - logo
 

Rezultati iskanja

Osnovno iskanje    Ukazno iskanje   

Trenutno NISTE avtorizirani za dostop do e-virov UM. Za polni dostop se PRIJAVITE.

1 2
zadetkov: 12
1.
  • Evaluation of the relations... Evaluation of the relationship between the collapsed mechanism and excavation method in tunnels excavated in schists
    Aygar, Ebu Bekir Scientific reports, 12/2022, Letnik: 12, Številka: 1
    Journal Article
    Recenzirano
    Odprti dostop

    The problems experienced in tunnels excavated under high cover in graphitic schists generally vary according to the squeezing mechanism. During the tunnel excavation, slips occur on the slickenside ...
Celotno besedilo
2.
  • Evaluation of new Austrian ... Evaluation of new Austrian tunnelling method applied to Bolu tunnel's weak rocks
    Aygar, Ebu Bekir Journal of Rock Mechanics and Geotechnical Engineering, June 2020, 2020-06-00, 2020-06-01, Letnik: 12, Številka: 3
    Journal Article
    Recenzirano
    Odprti dostop

    Since the development of the new Austrian tunnelling method (NATM) in the 1960s, this technique has been applied successfully in many tunnels. However, opinions of NATM principles emerged till 2000, ...
Celotno besedilo

PDF
3.
  • Performance of the Flexible... Performance of the Flexible and Rigid Lining under Earthquake Impact and Weakness of the New Austrian Tunneling Method (NATM) Principles, a Specific Case Study of the Bolu Tunnel
    Aygar, Ebu Bekir Sustainability, 11/2023, Letnik: 15, Številka: 21
    Journal Article
    Recenzirano
    Odprti dostop

    The Bolu tunnel is located between the Istanbul-Ankara Highway and its construction took approximately 13 years. Since the beginning of the tunnel excavation, serious deformations and stability ...
Celotno besedilo
4.
  • A special support design fo... A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
    Aygar, Ebu Bekir; Gokceoglu, Candan Environmental earth sciences, 2021/1, Letnik: 80, Številka: 1
    Journal Article
    Recenzirano

    Throughout construction process of a tunnel in an active tectonic region, it may be impossible to avoid active faults. Active faults create two adverse effects on the tunnels which are sudden fault ...
Celotno besedilo
5.
  • Analytical solutions and 3D... Analytical solutions and 3D numerical analyses of a shallow tunnel excavated in weak ground: a case from Turkey
    Aygar, Ebu Bekir; Gokceoglu, Candan International Journal of Geo-Engineering, 12/2021, Letnik: 12, Številka: 1
    Journal Article
    Recenzirano
    Odprti dostop

    Due to the increasing population and resulting transportation needs, the number of subway and high-speed railway projects has also increased. The geometric constraints of such projects have caused ...
Celotno besedilo

PDF
6.
  • Problems Encountered during... Problems Encountered during a Railway Tunnel Excavation in Squeezing and Swelling Materials and Possible Engineering Measures: A Case Study from Turkey
    Aygar, Ebu Bekir; Gokceoglu, Candan Sustainability, 02/2020, Letnik: 12, Številka: 3
    Journal Article
    Recenzirano
    Odprti dostop

    The T3 railway tunnel—under construction within the scope of the Bursa-Yenişehir high-speed train project—is located in northwestern Turkey and has a length of 1250 m. The tunnel is being constructed ...
Celotno besedilo

PDF
7.
  • A Geotechnical Perspective ... A Geotechnical Perspective on a Complex Geological Environment in a High-Speed Railway Tunnel Excavation (A Case Study from Türkiye)
    Gokceoglu, Candan; Aygar, Ebu Bekir; Nefeslioglu, Hakan A. ... Infrastructures, 11/2022, Letnik: 7, Številka: 11
    Journal Article
    Recenzirano
    Odprti dostop

    The T26 tunnel was designed within the scope of the Ankara-Istanbul high-speed railway in accordance with the speed of 250 km/h. Some serious problems and excessive deformations were encountered ...
Celotno besedilo
8.
  • Tunneling problems in weak ... Tunneling problems in weak rock conditions under shallow overburden and comparison between full-face excavation and sequence excavation methods
    Aygar, Ebu Bekir; Karahan, Servet; Gokceoglu, Candan Geomechanics and geoengineering : an international journal, 07/2024, Letnik: 19, Številka: 4
    Journal Article
    Recenzirano

    The T8 tunnel was constructed within the scope of the Ankara - Sivas High-Speed Railway project. The tunnel route is formed completely by very weak and weak lithological units. The overburden ...
Celotno besedilo
9.
  • Analytical and Numerical An... Analytical and Numerical Analyses of the Support System for a Large-span Tunnel in Challenging and Seismically Active Ground Conditions
    Aygar, Ebu Bekir; Karahan, Servet; Gullu, Suat ... Transportation infrastructure geotechnology, 12/2023, Letnik: 10, Številka: 6
    Journal Article
    Recenzirano

    The Dogancay T1 tunnel, projected within the scope of the Ankara-Istanbul high-speed train project, is being excavated entirely through clay and cohesionless units and is located in the North ...
Celotno besedilo
10.
Celotno besedilo

PDF
1 2
zadetkov: 12

Nalaganje filtrov