UNI-MB - logo
UMNIK - logo
 

Rezultati iskanja

Osnovno iskanje    Ukazno iskanje   

Trenutno NISTE avtorizirani za dostop do e-virov UM. Za polni dostop se PRIJAVITE.

1 2 3
zadetkov: 22
21.
  • Performance Analysis of Exi... Performance Analysis of Existing 600MW Coal-Fired Power Plant with Ammonia-Based CO2 Capture
    Gang Xu; Liqiang Duan; Mingde Zhao ... 2010 International Conference on Electrical and Control Engineering, 2010-June
    Conference Proceeding

    This paper analyzes the techno-economic performance of 600 MW coal-fired power plant with and without ammonia-based CO 2 capture process, based on the operating data of an existing power plant. The ...
Celotno besedilo
22.
Celotno besedilo

Nalaganje filtrov