E-viri
Recenzirano
-
Krajewski, Lee; Wei, Jerry C.; Tang, Ling-Lang
Journal of operations management, July 2005, Letnik: 23, Številka: 5Journal Article
This multiple case study explores the reaction strategies suppliers use to respond to short-term dynamics of schedule changes in build-to-order supply chains. We examine the relationship and supply chain processes between a notebook computer manufacturer and five component suppliers. Two distinct reaction strategies emerge from these five buyer–supplier dyads. The “reduce uncertainty” strategy emphasizes supply contracts with a high degree of restrictiveness, relatively infrequent schedule revisions, and a high level of form postponement. The “cope with uncertainty” strategy emphasizes flexible supply contracts, relatively frequent schedule revisions, and low levels of form postponement. Eight propositions are formulated to understand the linkage between a supplier's power, its short-term process flexibility, and the elements of its reaction strategy. The paper concludes by proposing future research directions.
Vnos na polico
Trajna povezava
- URL:
Faktor vpliva
Dostop do baze podatkov JCR je dovoljen samo uporabnikom iz Slovenije. Vaš trenutni IP-naslov ni na seznamu dovoljenih za dostop, zato je potrebna avtentikacija z ustreznim računom AAI.
Leto | Faktor vpliva | Izdaja | Kategorija | Razvrstitev | ||||
---|---|---|---|---|---|---|---|---|
JCR | SNIP | JCR | SNIP | JCR | SNIP | JCR | SNIP |
Baze podatkov, v katerih je revija indeksirana
Ime baze podatkov | Področje | Leto |
---|
Povezave do osebnih bibliografij avtorjev | Povezave do podatkov o raziskovalcih v sistemu SICRIS |
---|
Vir: Osebne bibliografije
in: SICRIS
To gradivo vam je dostopno v celotnem besedilu. Če kljub temu želite naročiti gradivo, kliknite gumb Nadaljuj.